UPC
Comment
Letter
on
Brisbane
Baylands
DEIR
January
24,
2014
UPC2
Page4
6.
Surface
Water
Hydrology
and
Water
Quality
(Chapter
4.H)
a.
Funding
for
Ongoing
Maintenance.
The
second
to
last
sentence
of
Mitigation
Measure
4.H-1c
should
be
revised
as
follows:
The
SMP
shall
provide
operations
and
maintenance
guidelines
for
all
of
the
BM
P's
identified
in
the
SMP,
provide
operations
and
maintenance
guidelines
for
all
of
the
BMPs
identified
in
the
SMP,
including
LID
measures
and
other
BMPs
designed
to
mitigate
potential
water
quality
degradation
of
runoff
from
all
portions
of
the
completed
development,
and
shall
clearly
identify
the
entity
responsible
the
funding
sources
for
the
required
ongoing
maintenance.
Timing
of
Systemwide
Drainage
Improvements.
Mitigation
Measure
4.H-4a,
band
c
b.
could
be
read
to
require
implementation
of
systemwide
improvements
as
a
condition
to
issuance
of
any
building
permit
within
the
Project
Site.
As
a
practical
matter,
the
City
would
approve
a
master
drainage
plan
for
the
Project
prior
to
issuance
site-specific
development
plans,
but
actual
implementation
and
installation
of
drainage
improvements
will
be
determined
in
accordance
with
a
project
phasing
plan
to
be
adopted
by
the
City
in
connection
with
the
Specific
Plan
and
Development
Agreement
approvals,
as
well
as
by
applicable
regulatory
approvals
from
BCDC,
Army
Corps
and
the
California
Department
of
Fish
and
Wildlife.
These
mitigation
measures
should
be
revised
to
reflect
the
phased
implementation
of
the
master
drainage
plan
when
and
as
needed
to
accommodate
site-specific
development
over
time.
To
the
extent
that
required
improvements
would
require
the
cooperation
of
PG&E
and
the
owner
of
the
Levinson
Overflow
Area,
the
EIR
should
identify
this.
7.
Noise
and
Vibration
(Chapter
4.J).
12
13
a.
Truck
Loading:
Mitigation
Measure
4.J-3a
requires
formal
truck
delivery
areas
(e.g.
loading
bays)
to
be
located
at
least
100
feet
from
residences
to
maintain
noise
levels
of
less
than
5
dBA
over
existing
monitored
noise
levels.
DSP
and
DSP-V
includes
mixed-use
development,
with
residential
in
close
proximity
or
within
the
same
structure
as
commercial
use,
and
implementation
of
this
mitigation
measure
may
be
infeasible
in
such
instances.
We
would
recommend
revising
this
mitigation
measure
to
require
a
noise
study
in
cases
where
this
mitigation
measure
cannot
be
implemented,
to
achieve
project
design
as
necessary
to
mitigate
noise
impacts
from
loading
activities
prior
to
issuance
of
a
building
permit.
8.
Population
and
Housing
{Chapter
4.K)
14
a.
ABAG
Projections.
The
DEIR
finds
significant
and
unavoidable
impacts
related
to
the
exceedance
of
ABAG's
population
and
employment
projections.
Since
the
publication
of
the
DEIR,
ABAG
has
adopted
new
population
and
employment
projections
in
the
2013
Plan
Bay
Area.
ABAG
is
also
required
to
adopt
new
projections
in
the
upcoming
2017
Plan
Bay
Area.
Should
the
2017
Plan
Bay
Area
increase
ABAG's
population
and
employment
projections,
then
this
significant
impact
would
be
avoided.
We
suggest
the
following
clarifications
(additions
shown
in
underline)
to
be
added
in
the
EIR:
15
DEIR
Pages
4.K-28
and
4.K-30
and
-31
Conclusion:
The
growth
in
employment
and
households
resulting
from
the
DSP
scenario
would
accommodate
a
substantial
portion
of
the
housing
and
employment
needs
projected
by
ABAG
for
Brisbane
and
surrounding
cities
but
would
greatly
exceed
ABAG
projections
for
Brisbane.
The
impact
of
exceeding
housing
and
employment
projections
is
manifested
in
the
DSP's
significant
unavoidable
traffic
and
air
quality
impacts.
Because
the
DSP
scenario
proposes
a
5-532