3.
Revisions
to
the
Text
of
the
Draft
EIR
Page
4.A-42
UPC
2-5
[See
page
5-530
for
the
original
comment]
REVISE
Mitigation
Measure
4.A-4b
to
read
as
follows.
Mitigation
Measure
4.A-4b:
All
building
exteriors
within
the
Baylands
Project
Site
shall
be
composed
of
textured
and
other
non-reflective
materials,
including
high-performance
tinted
non-mirrored
glass.
Reflective
materials
on
building
exteriors
that
have
a
light
reflectivity
factor
greater
than
30
percent
shall
be
limited
to
less
than
50
percent
of
any
wall
area
mirrored
glass
shall
be
prohibited.
Air
Quality
Page
4.B-1
BBCAG-20
[See
page
5-92
for
the
original
comment]
REVISE
the
final
paragraph
as
follows:
Brisbane’s
proximity
to
the
onshore
breezes
stimulated
by
the
Pacific
Ocean
provides
for
generally
very
good
air
quality
at
the
Project
Site.
These
winds
are
the
result
of
the
presence
of
the
San
Bruno
Alemany
Gap
to
the
west
of
the
Project
Site.
The
San
Bruno
Alemany
Gap
is
oriented
northwest
to
southeast,
the
same
direction
as
the
prevailing
wind
with
elevations
under
200
feet.
Consequently,
the
Project
Site
receives
some
of
the
highest
wind
speeds
along
the
peninsula.
These
winds
maintain
relatively
good
air
quality
in
the
flat
valley
portions
of
Brisbane.
Page
4.B-21
BCC-66
[See
page
5-176
for
the
original
comment]
ADD
the
underlined
text
to
the
first
bullet
under
Mitigation
Measure
4.B-1
as
follows:
Basic
Controls
that
Apply
to
All
Construction
Sites
1.
All
exposed
surfaces
(e.g.,
parking
areas,
staging
areas,
soil
piles,
graded
areas,
and
unpaved
access
roads)
shall
be
watered
as
needed,
but
no
less
than
two
times
per
day
on
days
with
no
precipitation.
Page
4.B-22
SBMW-6
[See
page
5-500
for
the
original
comment]
and
OSEC-92
[See
page
5-316
for
the
original
comment]
ADD
the
following
bullet
to
Mitigation
Measure
4.B-1
on
Draft
EIR
page
4.B-22:
Construction
foreman
and
crew
shall
receive
training
from
contractors
on
implementation
of
the
above
emission
reduction
techniques
prior
to
each
development
phase.
Page
4.B-37
UPC
2-6
[See
page
5-530
for
the
original
comment]
REVISE
the
third
bullet
in
Mitigation
Measure
to
read
as
follows.
Provide
and
maintain
showers
and
changing
facilities
for
employees
in
buildings
having
a
gross
leasable
area
of
25,000
square
feet
or
more
as
a
condition
of
final
building
permit;
Brisbane
Baylands
Final
EIR
3-41
May
2015
Previous Next