San
Bruno
Mountain
Watch•
PO
Box
53,
Brisbane,
CA
94005
www.mountainwatch.org
•
sanbruno@mountainwatch.org
•
415-467-6631
SBMW
is
a
non-profit
501c3
corporation
SBMW
SBMW
Baylands
DEIR
Comments
Please
record
these
comment
s
in
t
he
EIR.
General
Comments:
1.
There
are
many
impact
s
discussed
in
this
EIR
wit
h
many
complex
mitigation
measures
designed
to
remed
iate
the
impacts.
These
m
it
igat
ions
w
ill
only
have
their
desired
outcomes
if
they
are
carefully
enforced
and
paid
for.
Monit
oring,
enforcement
and
funding
are
themselves,
therefore,
mitigations
that
should
be
covered
in
t
his
EIR.
1
2.
Since
this
is
a
large
complex
project
projected
to
take
20+
years
t
o
complete,
chances
are
great
that
new
conditions
will
develop
--
or
be
discovered
--
during
the
life
span
of
the
project
that
w
ill
impact
t
he
environment.
A
mechanism
for
adjusting
to
t
hese
changing
conditions
should
be
an
additional
mitigation
for
the
project.
Such
a
mitigation
should
include
planned
review
periods,
provisions
for
emergency
reviews,
and
plans
for
paying
the
costs
of
these
reviews.
2
Chapter
4.
Environmental
setting,
impacts
and
mitigation
measures.
Air
Quality
Page
4.B-6
"The
current
attainment
status
for
the
San
Francisco
Bay
Area
Air
Basin,
with
respect
to
federal
standards,
is
summarized
in
Table
4.B-2.
In
general,
the
Bay
Area
Basin
experiences
low
concent
rations
of
most
pollutants
w
hen
compa
red
to
federal
standards,
except
for
ozone
and
particulate
matter
(PM10
and
PM2.5),
for
which
standards
are
exceeded
periodica
lly."
Comment:
This
may
be
cha
nging
--
t
he
Bay
Area
has
had
18
Spare
the
Air
days
t
his
w
inter.
Warmer
winters,
with
more
high
pressure
days
may
increase
t
he
number
of
high
pollution
days.
How
w
ill
the
EIR
adjust
for
condit
ions
that
change?
Comment:
Not
all
dust
is
t
he
same.
Beca
use
of
the
landfill,
Baylan
ds
dust
may
contain
more
contaminants.
How
is
this
addressed?
Page
4.B-23
Comment:
The
history
of
the
revisions
for
air
quality
standards
illustrates
of
how
standards
are
evolving.
How
does
the
EIR
address
possible
futu
re
changes?
Page
4.B-26
Mitigation
Measure
4.B-2a:
To
reduce
construction
vehicle
emissions,
the
following
provisions
shall
be
incorporated
into
construction
specifications
for
all
projects
on
the
Baylands:
Comment:
Reducing
engine
idle
t
imes
and
keep
up
with
a
stringent
vehicle
maint
enance
schedule
--
these
m
itigations
may
be
difficu
lt
to
enforce.
For
example,
most
large
diesel
t
ruck
drivers
leave
motors
running
though
standards
already
ca
ll
for
t
hem
to
be
t
urned
off.
Comment:
This
impact
is
inconsistent
w
ith
the
2010
Clean
Air
Act
--
t
his
in
itself
is
an
impact
.
3
6
I
7
5-500
Previous Next