2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
The
Draft
EIR
provides
an
analysis
of
the
physical
environmental
impacts
of
proposed
Baylands
development
by
comparing
existing
(baseline)
conditions
to
those
that
would
occur
with
implementation
of
proposed
development.
The
existing
soils
processing
activities
within
the
Baylands
are
being
undertaken
within
the
footprint
of
the
former
landfill.
Proposed
landfill
closure,
remediation,
and
grading
activities,
which
will
occur
at
the
outset
of
Project
Site
development,
will
require
cessation
of
the
existing
soils
process
activities.
Thus,
the
air
emissions
impacts
of
existing
soils
processing
activities
will
cease
once
the
construction
activities
analyzed
in
the
Draft
EIR
commence.
The
referenced
report
by
Dr.
Fred
Lee,
Report
on
the
Adequacy
of
the
Investigation/Remediation
of
the
Brisbane
Baylands
UPC
Property
Contamination
Relative
to
Development
of
this
Property
,
was
reviewed
and
was
found
to
contain
no
references
to
air
pollutants,
ingestion
of
toxics
from
construction
disturbance,
or
phtyoremediation.
That
report
is
available
as
part
of
the
proposed
Baylands
development
public
record
at
the
Brisbane
Community
Development
Department,
50
Park
Place,
Brisbane,
California.
The
Draft
EIR
contains
a
hazards
assessment
of
construction-related
hazards
in
Impact
4.G-2
on
page
4.G-90
of
Section
4.G,
Hazards
and
Hazardous
Materials
.
Project
Site
development
and
construction
activities,
including
demolition
and
remediation
activities,
for
all
four
scenarios
will
require
disturbance
of
subsurface
soils
and
groundwater.
As
discussed
above,
past
land
uses,
including
former
Brisbane
Landfill
and
Southern
Pacific
Railyard
operations,
resulted
in
soil
and
groundwater
contamination
at
the
former
landfill,
and
The
analysis
of
this
impact
found
that
in
addition
to
compliance
with
federal,
state,
and
local
regulations
pertaining
to
the
handling
and
disposal
of
hazardous
waste,
including
preparation
and
implementation
of
a
Soil
and
Groundwater
Management
Plan
and
a
Master
Deconstruction
and
Demolition
Plan,
hazards
to
the
public
through
foreseeable
upset
or
accident
conditions
involving
the
release
of
hazardous
materials
into
the
environment
would
be
reduced
to
a
less
than
significant
level
with
implementation
of
Mitigation
Measures
4.G-2a,
4.G-2b,
4.G-2c,
4.G-2d.
The
first
bullet
under
Mitigation
Measure
4.B-1
on
page
4.B-21
regarding
fugitive
dust
is
revised
to
read
as
follows:
Basic
Controls
that
Apply
to
All
Construction
Sites
1.
All
exposed
surfaces
(e.g.,
parking
areas,
staging
areas,
soil
piles,
graded
areas,
and
unpaved
access
roads)
shall
be
watered
as
needed,
but
no
less
than
two
times
per
day
on
days
with
no
precipitation.
Brisbane
Baylands
Final
EIR
2.9.2-20
May
2015