SFBT
Mr.
John
Swiecki
I
Brisbane
Bay/andsDEIR
January
24,
2014
I
p.
2
•
The
programmatic
DEIR
did
not
provide
a
detailed
analysis
of
the
two
proposed
trail
alignment
s.
A
Bay
Trail
alignment
integrated
into
the
development
grid
as
a
Class
I
facility
will
likely
be
a
quieter
and
more
visually
appealing
experience,
but
may
introduce
safety
issues
for
bicyclists
and
pedestrians
at
intersection
crossings.
A
trail
along
the
highway
corridor
may
be
a
preferred
alignment
for
a
commuting
cyclist,
but
could
be
visually
uninviting
and
noisy
if
placed
between
buildings
and
the
freeway.
Our
preference
is
for
the
designated
Bay
Trail
alignment
to
be
safely
integrated
into
the
development
as
a
Class
I
multi-use
path
rather
than
along
the
edge
of
the
highway.
Bicycle
and
Pedestrian
Safety
and
Experience
The
DEIR
assumes
that
certain
bicycle
and
pedestrian
circulation
network
improvements
shown
in
the
DSP
and
DSP-V
scenarios
also
apply
to
the
CPP
and
CPP-V
scenarios.
Both
plans
have
a
combination
of
Class
I
multi-use
paths
and
bicycle
lanes/sidewalks
for
the
Bay
Trail.
The
proposal
requires
bicyclists
and
pedestrians
to
transition
from
a
Class
I
multi-use
path
to
bicycle
lanes
and
sidewalks
at
N
Street,
along
gth
Street
and
on
the
Geneva
Avenue
overpass.
The
San
Francisco
Bay
Trail
Plan
encourages
the
siting
and
design
of
the
Bay
Trail
to
accommodate
the
w
idest
range
of
trail
user
skill
levels.
Trail
Design
Policy
12.
Provide
access
wherever
feasible
to
the
greatest
range
of
trail
users
on
each
segment.
Trail
Design
Policy
13.
Wherever
possible,
new
trails
should
be
physically
separated
from
streets
and
roadways
to
ensure
the
safety
of
t
rail
users.
The
following
changes
are
recommended:
•
Class
I
multi-use
paths
are
the
preferred
facilities
in
the
development
area
and
along
the
proposed
new
Geneva
Avenue
extension
over
Highway
101.
A
separated
pathway
for
bicyclists
and
pedestrians
is
necessary
for
safe
and
continuous
access
between
Brisbane
and
San
Francisco.
In
Table
4.N.7,
the
footnote
indicates
that
on
the
Geneva
Avenue
Extension,
the
Class
II
bicycle
lanes
will
be
open
to
through
vehicular
traffic
during
peak
hours.
Shifting
vehicles
into
bike
lanes
causes
confusion
and
a
loss
of
consistent
use
of
the
facility.
It
also
defeats
the
purpose
of
encouraging
bicycle
commute
options
by
shifting
bicyclists
onto
the
narrow
shoulder
during
peak
commute
hours.
Mitigation
Measures
4.N.19
and
4.N.11
should
require
fully-separated
Class
I
multi-use
paths
throughout
the
development
area,
including
the
Geneva
Avenue
Extension.
•
•
I
would
like
to
be
involved
in
future
discussions
about
bicycle
and
pedestrian
circulation
and
decisions
about
the
new
Bay
Trail
alignment
in
Brisbane.
Thank
you
for
considering
these
comments
and
please
contact
me
at
510-464-7935
or
laurat@abag.ca.gov
if
you
have
questions.
Sincerely,
I
Laura
Thompson
Bay
Trail
Project
Manager
5-515