2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
2.9.11
San
Francisco
Bay
Trail
SFBT-1
[See page
5-514 for the original comment]
Comment
SFBT-1
provides
an
introduction
to
the
San
Francisco
Bay
Trail’s
comment
letter.
It
does
not
raise
any
substantive
environmental
issues
regarding
the
adequacy
of
the
Draft
EIR
or
its
analyses
and
conclusions.
[See page
5-514 for the original comment]
The
San
Francisco
Bay
Trail
is
intended
to
be
a
Class
I
facility
as
it
passes
through
the
Baylands
Project
Site.
The
design
of
intersection
crossing
will
be
determined
as
part
of
the
design
of
the
Bay
Trail
and
roadway
improvement
plans
within
the
Baylands
Project
Site.
The
alignment
preference
as
stated
in
the
comment
is
noted
and
will
be
taken
into
consideration
in
the
City’s
Baylands
planning
process.
[See page
5-515 for the original comment]
A
paragraph
is
added
page
4.N-145
preceding
the
conclusion
to
read
as
follows.
As
noted
in
Table
4.N-7,
the
currently
proposed
configuration
for
the
Geneva
Avenue
extension
would
open
bicycle
lanes
to
vehicular
traffic
along
the
Geneva
Avenue
extension.
Five-foot-wide
bicycle
lanes
would
be
provided
adjacent
to
the
curb,
next
to
the
sidewalk.
Shifting
the
location
of
bicycle
lanes
along
the
proposed
Geneva
Avenue
extension
during
peak
and
non-peak
travel
times
could
cause
safety
problems
along
the
roadway.
Mitigation
Measure
4.N-11
is
revised
to
read
as
follows.
Mitigation
Measure
4.N-11:
Prior
to
issuance
of
the
first
building
occupancy
permit
for
new
development
other
than
improvement
or
relocation
of
an
existing
use
within
the
Project
Site,
roadways
and
trails
shall
provide
for
safe
accessibility
for
bicycles
to
buildings
and
recreational
areas
throughout
the
Project
Site,
including
connections
to
offsite
bicycle
routes
and
trails.
In
addition,
Project
Site
land
uses
shall
provide
bicycle
parking
in
appropriate
areas
(i.e.,
where
they
will
get
the
most
use,
where
security
is
maximized,
and
where
pedestrian
circulation
is
minimally
affected
by
their
presence).
The
minimum
standards
contained
in
this
mitigation
measure,
along
with
the
equivalent
bicycle
access
as
that
shown
in
Table
4.N-7,
shall
be
included
in
any
specific
plan
approved
for
development
within
the
Project
Site
provided,
however,
that
shifting
of
the
location
of
bicycle
lanes
between
peak
and
non-peak
hours
shall
not
be
permitted.
In
addition,
the
Bay
Trail
connection
through
the
Baylands
Project
site
shall
be
designed
as
a
multi-use
Class
I
facility
where
feasible.
SFBT-2
SFBT-3
Brisbane
Baylands
Final
EIR
2.9.11-1
May
2015