OSEC
Open
Space
&
Ecology
CEQA
Comments
on
Brisbane
Baylands
Draft
EIR
-
2013
Odds
o
f
ex
ceeding
refere
nce
flood
level
by
2030
With
g
lobal
.
l
warming
Without
global
warmi
ng'
Projected
sea
l
ev
el
rise
by
2050~
Wat.er
level
station
La
Jolla-
Pacific
OceC11
--
Reference
100-year
flood
le
vel
(feet)'
Measured
historic
sea
level
rise
•
Inches
ri
se
Period
of
record
Inches
r
ise
2009-2050
90%
range
3.2
3.2
3.5
3.4
4.1
4.4
89%
83%
32%
39%
27%
38%
0%
0%
1%
1%
6%
0%
7
3
2
2
9
1924-2006
1923-2006
19
45-2006
1973-2006
1897-2006
1970-2006
11
10
9
10
11
9
4-22
3-20
2-19
265
cont.
LosAngeles-
Out
er
Harbor
Port
San
Luis
-
Pacific
Ocean
Monterey-
M
ont
erey
Harb
or
San
Francisco-
San
Francisco
Ba(
Charleston
-
Coos
Bay
(OR)
3-20
4-21
2-20
2
Climate
Central:
http://slr.s3.amazonaws.com/factsheets/California.pdf
Kinder
Morgan
FAQs:
http://www.ci.brisbanc.ea.us/i-want/rcad/kindcr-morgan-faqs
Page4.H-29
Storm
drainage
system
improvements
Mitigation
Measure
4H-4a
says
"
...
all
site-specific
development
plans
...
shall
include
system
wide
drainage
improvements
that
shall
...
correct
known
existing
deficiencies
(e.g.,
Levinson
Overflow
Area
and
the
PG&E
property)."
Please
explain
exactly
what
drainage
improvements
must
be
completed
as
part
of
the
site-specific
development.
Mitigation
Measure
4H-4b
says
"
...
all
site-specific
development
plans
shall
include
additional
conveyance
capacity
by
incorporation
new
storm
drain
facilities
along
Bayshore
Boulevard
north
of
Industrial
Avenue."
Does
this
require
that
no
development
may
proceed
without
these
new
storm
drain
facilities?
Mitigation
Measure
4H-4c
says
"
...
au
development
plans
shall
include
conveyance
improvements
to
existing
Visitacion
Creek
...
and
extent
it
...
to
the
Roundhouse
area
....
"
The
roundhouse
area
is
heavily
contaminated
with
Bunker
C
oil.
The
DEIR
should
be
less
specific
about
the
routing
of
the
creek,
because
sitting
it
right
above
the
Bunker
C
contamination
may
not
be
approved.
Measure
4H-4c
further
requires
development
to
"
...
remove
the
existing
Timber
Box
Culvert
...
and
replace
it
with
an
open
channel
system
prior
to
Project
site
development
completion."
Does
this
require
that
these
improvements
must
be
made
before
any
site-specific
development?
Page
4.H-30
Mitigation
Measure
4H-4c
says
"
...
aU
development
plans
shall
include
conveyance
improvements
to
existing
Visitacion
Creek
...
and
extent
it
...
to
the
Roundhouse
area
....
"
The
roundhouse
area
is
heavily
contaminated
with
Bunker
C
oil.
The
DEIR
should
be
less
specific
about
the
routing
of
the
creek,
because
sitting
it
right
above
the
Bunker
C
contamination
may
not
be
approved.
Page
4.H-29-30
Mitigation
measure
4.H-4A,
B
and
C.
A
master
drainage
plan
should
be
approved
before
issuing
permits
and
beginning
construction.
Page4.H-32
Paragraph
3
"C.3
for
new
development
that
would
introduce
10,000
square
feet
of
new
impervious
surfaces,
the
specific
project
applicant
would
incorporate
LID
strategies
....
"
Will
any
specific
projects
fall
under
this
threshold?
What
will
happen
if
they
do?
What
measures
will
still
be
required
and
what
will
the
project
be
exempt
from?
Do
we
want
the
same
requirements
for
projects
over
10,000
feet?
Page4.H-33
As
a
mitigation
measure
for
excess
storm
water,
the
city
of
Rotterdam
in
the
Netherlands
is
using
sunken
areas
(public
plazas
and
playgrounds)
as
temporary
reservoirs
that
can
be
drained
once
a
flood
event
has
passed.
Why
was
this
not
considered
as
a
mitigation
measure?
Page4.H-34
5th
bullet
"insects
that
prey
on
eat
target
pests",
the
word
"eat"
can
be
omitted.
I
I
I
I
266
267
268
269
I
I
270
271
I
I
272
273
41
5-346
Previous Next