OSEC
Open
Space
&
Ecology
CEQA
Comments
on
Brisbane
Baylands
Draft
EIR
-
2013
of
San
Francisco
Bay
indicated
the
storm
surges,
driven
by
the
low
atmospheric
pressures
and
strong
onshore
winds,
make
significantly
higher
than
average
tides
like
ly
during
extreme
wet
weather
conditions".
Figure
4.H-3
is
based
on
the
FEMA
map,
the
new
analysis
should
be
used?
Page
4.H-1
1
And
page
4.1-49
Policy
388.
Include
as
part
of
the
document
the
BMPs
for
curtailing
non-point
discharge
from
NPDES
to
ensure
trash
and
litter
is
kept
out
of
the
storm
water
system.
Without
this
information
it
is
difficult
for
people
to
determine
if
mitigation
measures
are
good
enough
for
the
community.
A
section
should
be
added
on
how
SWPPs
and
NPDES
will
help
the
effects
of
littering
on
the
watershed
.
.
In
the
DSP
and
DSP-V
(and
future
CPP
and
CPP-V)
programs
to
minimize
solid
waste
generation
should
specifically
target
littering
issues,
e.g.
location
of
trash
bins.
Page
4-H-12
In
the
last
sentence
under
General
Permit
Provisions,
it
has
been
estimated
that
the
project
site
will
have
a
Risk
Level
2.
The
document
should
explain
how
the
consultant
believes
this
is
a
level
2
project.
Who
makes
the
level-of-
risk
determination,
and
on
what
basis?
Page
4.H-13
Including
specific
examples
of
what
is
covered
in
the
two
types
of
BMPs
would
be
helpful
for
the
understanding
of
the
distinctions
between
them.
Page
4.H-15
Under
sea
level
rise
it
is
stated,
"BCDC's
jurisdiction
within
the
Project
Site
includes
the
Brisbane
Lagoon,
Visitacion
Creek,
and
a
100-foot
shoreline
band
around
these
features,
each
of
which
are
designated
Waterfront
Park,
Beach
in
the
Plan.
Specify
where
BDDS
jurisdiction
is
and
where
other
agency
jurisdiction
begins
after
the
100-foot
shoreline.
What
agency
will
be
responsible
for
the
area
outside
of
the
100-foot
shoreline
after
sea
level
rise?
Page4.
H-18
Please
provide
details
about
how
provisions
C3
requirements
will
be
implemented
such
as
rainwater
harvesting
and
reuse.
Page4.H-20
Page
4.H-20
states
"
...
the
shallow
groundwater
aquifer
would
be
the
one
encountered
during
Project
Site
construction."
Core
sampling
and
pile
driving
will
penetrate
the
lower
aquifer,
not
just
the
shallow
aquifer.
This
should
be
included
in
impacts
and
mitigation
measures
4.H-la
and
4.H-
l
b.
Page
4.H-21
What
is
the
impact
on
the
flow
of
water
that
currently
exists
on
the
site?
What
is
the
impact
of
runoff
during
a
storm?
How
will
the
drainage
change
due
to
less
permeable
surfaces
from
development?
The
flow
of
water
post
and
pre-construction
are
not
addressed
in
the
DEIR.
Page
4.H-21
Measure
4.H-la.
States
that
a
plan
will
be
submitted
and
that
this
plan
will
be
in
accordance
with
all
regulations
but
does
not
state
what
monitoring,
funding,
or
corrective
actions
will
take
place
should
the
plan
after
implementation
be
found
to
be
inadequate
.
Mitigation
should
also
include;
who
will
monitor
and
how,
and
corrective
action
to
be
taken.
Page4.H-22
With
4.C-
l
G
3rd
bullet
from
the
bottom
states,
"Any
increase
in
impervious
surface
area
shall
include
establishment
of
vegetated
swales,
permeable
pavement
materials,
preserve
vegetation,
re-plant
with
native
vegetation
and
appropriate
measures
should
be
evaluated
and
implemented
where
appropriate."
It
is
unclear
whether
vegetation
will
be
above
concrete
areas.
However,
on
statements
on
page
4.H-22
are
contradictory,
"
..
.
paved
areas
would
result
in
an
increase
in
the
amount
of
impervious
surfaces
within
the
Project
Site
and
would
increase
stormwater
runoff
generation
and
flows."
Only
an
increase
in
impervious
surfaces
should
be
mitigated.
t
I
I
I
248
cont.
249
250
I
I
251
I
I
I
252
253
254
255
256
I
257
258
39
5-344
Previous Next