Page
4.E-41.
42
Impact
4.E-4
states,
"
...
the
potential
placement
of
engineered
fill
may
cause
underlying
Bay
Mud
to
fail."
For
many
years,
consultants
for
the
landowner
have
argued
that
Bay
Mud
is
a
relatively
impermeable
layer
that
prevents
contamination
in
the
fill
from
reaching
the
aquifers.
What
can
be
done
to
prevent
cross-contamination
from
the
landfill
into
the
aquifer
if
failure
of
the
Bay
mud
were
to
occur?
Page4.E-42
A
table
similar
to
4.E-4
on
page
4.E-21
should
be
made
to
display
measure
of
stability
of
development.
Page4.E-42
The
scale
mentioned
is
for
bedrock,
for
those
areas
not
built
on
pilings
what
would
be
an
appropriate
scale
to
make
a
determination
from?
Page4.E-43
Mitigation
measures
4.E-4a
and
4.E-4b
are
in
question
because
the
site
has
not
been
mapped
using
standards
from
the
C.A
Seismic
Hazard
Mapping
Act.
This
assessment
should
be
done.
Page4.E-44
"Policy
152
requires,
among
other
things,
that
soil
and
geologic
investigations
be
done
in
areas
identified
as
prone
to
slope
instability.
Therefore
in
complying
with
the
directive
of
Policy
152,
erosion
or
loss
of
soil
would
be
prevented."
Please
rework
this
statement
to
avoid
false
correlations
in
the
mind
of
the
reader
between
"performing
a
study"
and
"effective
prevention
of
soil
loss"
without
also
detailing
the
necessary
intervening
steps.
Page4.E-45
Explain
the
implications
of
over
consolidated
Young
and
Old
Bay
Mud.
Page4.E-45
Discussion
of
wick
drains
and
deep
dynamic
compaction.
The
use
of
wick
drains
is
assumed
in
estimates
of
settlement
at
the
landfill.
However,
wick
drains
may
increase
the
chances
of
cross-contamination
in
the
underlying
layers.
Please
discuss
the
possible
negative
effects
of
wick
drains
and
clarify
whether
or
not
the
DEIR
recommends
their
use.
Page4.E-45
During
compaction
will
hazardous
materials
move
offsite?
If
so,
proper
mitigation
measures
should
be
considered.
Page4.E-47
Paragraph
2
refers
to
the
use
of
wick
drains.
Please
consider
where
will
this
highly
contaminated
water
go?
How
will
it
be
processed?
Page4.E-50
Does
the
construction
of
a
recycled
water
plant
(on
page
4.0-48)
due
to
the
types
of
soil
have
an
impact
on
the
ability
to
support
the
recycled
water
plant?
I
I
I
I
I
I
167
I
I
Chaoter
4.F;
Greenhouse
Gas
Emissions
Page
4.F-1
In
the
introduction
to
this
section,
temperature
change
and
sea
level
rise
will
affect
flood
potential
and
the
potential
for
water
intrusion
in
the
Bay
lands.
Although
the
last
sentence
in
the
Introduction
states,
"Impacts
of
climate
change
on
the
project
Site,
including
sea
level
rise,
are
addressed
in
Section
4.H
...
"
there
is
actually
only
minimal
information
provided.
In
order
for
the
public
to
fully
understand
the
potential
impacts
of
climate
change,
the
topic
of
sea
level
rise
must
be
expanded
on.
Page
4.H-7
and
4.H-8
does
state
how
high
the
sea
level
is
expected
to
rise
on
site,
but
this
should
also
be
stated
in
this
section.
The
Environmental
Setting
does
not
address
issues
specific
to
the
Baylands.
For
example,
the
first
paragraph
states
that
"continued
warming
is
predicted
to
increase
global
average
temperature
between
2
and
11°F
23
5-328