weight
is
expected
to
cause
significant
noise
and
vibration.
What
will
be
the
mitigation
for
this?
Effects
of
compaction
such
as
this
should
be
included
in
the
Noise
and
Vibration
section
of
the
EIR.
Page
4.E-36
"Once
appropriately
designed
and
subsequently
constructed
in
accordance
with
local
and
state
building
code
requirements,
the
structures
would
have
the
structural
fortitude
to
withstand
anticipated
seismic
hazards
without
significant
damage."
Based
on
page
4.E-37
this
statement
should
say
Significant
and
Unavoidable
from
IX
and
X
from
table
4.E-4
that
shows
high
potential
risk
for
an
earthquake.
The
risk
is
high
and
there
will
be
little
to
no
protection
at
a
level
9
or
10
seismic
event.
Page4.E-38
The
definition
of
"Breach"
should
be
included
in
the
document
for
clarification.
Proper
mitigation
measures
should
be
considered,
and
should
include
responsible
agency
for
fixing
issues.
Page4.E-39
Mitigation
measure
4E-2.
Requiring
a
site-specific
geotechnical
report.
Please
add
more
detail
on
what
would
be
required
for
a
site-specific
geotechnical
report.
How
many
borings
would
be
required,
i.e
.,
borings
will
be
required
at
what
intervals?
How
deep
would
they
have
to
go?
How
far
outside
the
building
footprint
should
borings
be
required?
What
measures
would
have
to
be
taken
to
ensure
that
cross-contamination
of
water-bearing
layers
does
not
result
from
the
process
of
boring
or
driving
piles
or
other
foundation
work?
Page4.E-39
Measure
4.E-2b.
A
Post-Earthquake
Inspection
and
Corrective
Action
Plan
for
the
site-specific
development
..
.
shall
be
imp
lemented
in
the
event
of
a
magnitude
7.0
or
grater
earthquake
centered
with
in
30
miles
of
the
former
Brisbane
Landfill.
Results
of
the
inspection
of
containment
features
and
groundwater
and
leachate
control
facilities
potentially
affect
by
any
static
or
seismic
deformations
of
the
landfill
shall
be
reported
to
the
RWQCB
within
72
hours
of
the
event."
The
paragraph
goes
on
to
speak
of
what
types
of
mitigation
measures
may
be
undertaken.
However,
this
document
fails
to
address
who
will
be
doing
the
inspection,
who
will
be
implementing
mitigation
measures
and
on
what
time
frame.
Please
note
that
the
time
line
is
3
days
for
inspection
and
notification,
not
action
taken.
In
the
event
of
a
real
emergency
it's
reasonable
to
assume
that
the
timeline
might
stretch
out
longer
leaving
the
residents
of
Brisbane
with
a
toxic
time
bomb.
Designated
staff
to
work
with
the
RWQCB
is
also
needed.
Who
will
do
the
inspection?
Why
was
a
Richter
scale
of
7
chosen
instead
of
6.5?
Why
was
there
not
a
deadline
for
implementation?
If\
l
I
I
156
On
page
4.E-37
it
is
stated
that
there
is
high
probability
that
there
will
be
a
significant
seismic
event
within
the
next
20
years.
With
a
high
probability
of
an
earthquake
findings
determined
to
be
less
than
significant
are
not
consistent
with
these
risks.
Page4.E-40
Impact
4.E-3
and
page
4.E-41
Mitigation
measure
4.E-3.
Geotechnical
studies
within
1000
and
500
feet
of
a
building
should
be
done.
Page
4.E-40
In
the
last
paragraph
it
is
stated
that
the
"Potential
for
liquefaction
may
be
present.
..
"We
recommend
this
wording:
Potential
for
liquefaction
is
present.
This
is
due
to
evidence
in
map
on
page
4.E-29
Page4.E-40
Last
paragraph.
"potential
for
liquefaction
may
be
present.
..
"
Previous
evidence
present
within
the
chapter
has
shown
that
the
potential
for
liquefaction
is
clearly
present.
The
use
of
a
double
qualifier
makes
this
statement
invalid.
Suggest
replacing
[may
be]
with
[is].
Page
4.E-41
Analysis
from
Treadwell
&
Rollo,
Inc.
states
that,
"placement
of
engineered
fill
may
cause
underlying
Bay
Mud
to
fail."
The
DEIR
does
not
speak
to
this
issue
and
current
condition
of
site.
Not
knowing
this
information
makes
it
diffic
ult
to
determine
proper
mitigation
for
buildings
and
infrastructure.
~~