2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
left-turn
lanes
and
one
right-turn
lane
in
the
eastbound
direction.
Additional
road
widening
on
Lagoon
Road
&
Sierra
Point
Parkway
would
also
be
required.
The
signal
shall
be
constructed
and
accepted
for
public
maintenance
prior
to
issuance
of
occupancy
permits
for
any
site-
specific
development
that
would
cause
signal
warrants
to
be
met
in
the
AM
or
PM
peak
hour.
The
other
improvements
cited
in
this
measure
shall
be
constructed
and
accepted
for
public
maintenance
prior
to
issuance
of
occupancy
permits
for
any
site-specific
development
that
would
(1)
result
in
reducing
the
intersection
to
below
the
acceptable
LOS
standard,
or
(2)
contribute
additional
traffic
to
the
intersection
if
it
is
already
operating
below
the
acceptable
LOS
standard.
Mitigation
Measure
4.N-3g
if
revised
to
read
as
follows:
Mitigation
Measure
4.N-3g:
Prior
to
the
issuance
of
the
first
building
occupancy
permit
for
new
development
other
than
relocation
or
improvement
of
an
existing
use
within
the
Project
Site
Prior
to
issuance
of
occupancy
permits
for
any
site-specific
development
that
would
(1)
result
in
reducing
the
intersection
to
below
the
acceptable
LOS
standard,
or
(2)
contribute
additional
traffic
to
the
intersection
if
it
is
already
operating
below
the
acceptable
LOS
standard,
signal
timing
settings
at
the
Carter
Street/Geneva
Avenue
intersection
shall
be
modified
by
the
City
and
County
of
San
Francisco
to
provide
longer
green
time
on
eastbound/westbound
permitted
movements
and
longer
cycle
length.
In
addition,
site-specific
development
projects
that
would
(1)
result
in
reducing
the
intersection
to
below
the
acceptable
LOS
standard,
or
(2)
contribute
additional
traffic
to
the
intersection
if
it
is
already
operating
below
the
acceptable
LOS
standard
for
facilities
outside
of
the
City
of
Brisbane,
as
identified
in
Mitigation
Measures
4.N-1d
through
4.N-1f,
and
Mitigation
Measures
4.N-3f
through
4.N-3h
will
be
conditioned
as
part
of
Brisbane’s
planning
review
process
to
demonstrate
a
good
faith
effort
to
install
or
provide
fair
share
payment
for
needed
improvements
prior
to
issuance
of
building
permits.
BCC-663
BCC-664
[See page
5-280 for the original comment]
See
Response BCC-662.
[See page
5-280 for the original comment]
The
impact
analysis
uses
quantitative
inputs
to
determine
the
intersection
delay
and
LOS.
As
stated
on
page
4.N-97,
Mitigation
Measure
4.N-1b
would
improve
intersection
operations
at
Old
County
Road/Bayshore
Boulevard
to
operate
at
LOS
C
for
the
DSP
and
DSP-V
scenarios
and
LOS
D
for
the
CPP
and
CPP-V
scenarios.
By
improving
intersection
operations,
issues
of
traffic
backing
up
onto
the
Tunnel
Avenue
bridge
would
be
reduced.
[See page
5-280 for the original comment]
A
prescriptive
mitigation
measure
involves
listing
specific
improvements
to
mitigate
impacts,
such
as
adding
one
BCC-665
Brisbane
Baylands
Final
EIR
2.9.2-187
May
2015
Previous Next