BCC
existing
measures
is
inadequate.
This
DEIR
fails
to
recognize
that
improved,
newly
designed
systems
may
be
necessary
or
desirable.
This
utilizes
a
12
year-old
document,
which
has
not
had
proper
environmental
review.
All
proposed
plans
should
be
carefully
reviewed
for
environmental
impacts,
rather
than
be
determined
to
be
adequate
on
face
value.
Landfill
Final
Cover
System
"2-foot
thick
foundation
layer
using
onsite
cover
material
would
be
graded
over
the
entire
site
...
"
overall
"without
the
need
to
excavate
into
the
refuse
material
...
"
The
excavation
and
movement
of
a
near
ten
million
cubic
yards
(2010
estimate)
of
soil
will
have
great
impacts.
There
are
no
mitigation
measures
to
reduce
these
impacts,
such
as
a
more
modest
approach.
There
is
no
recognition
that
the
underground
hydrology
might
need
to
be
intercepted
by
the
impacts
of
grading
(as
the
surcharging
operation
has
done
on
the
landfill
portion
causing
artesian
effect,)
instead
there
is
a
mistaken
assertion
that
the
ground
cover
technique
proposed
will
resolve
a
great
percentage
of
groundwater
issues.
It
will
not.
(Refer
to
GF
Lee's
Report
and
experiences
at
Love
Canal
where
the
cover
forces
the
groundwater
and
their
contamination
upwards.)
4.G-80
"Placement
of
the
low-hydraulic-conductivity
layer
at
depths
as
described
in
the
Infrastructure
Plan.
..
"
The
impacts
of
this
and
an
additional
14
feet
of
fill
[filling
of
current
wetlands]
needs
to
be
reviewed
for
environmental
impacts.
Consideration
of
alternatives
to
this
practice
needs
to
be
done.
The
ability
for
natural
attenuation
remediation,
phyto-,
myco-,
and
hyper-accumulative
plant
remediation
strategies
are
overlooked
and
should
be
considered
an
alternative
to
this
proposed
fill
(cover-up)
remedial
action
approach.
For
example,
would
the
introduction
of
organic
acid
citrate
to
soils
cause
the
heavy
metals
to
be
bound
or
released
from
the
soil,
which
can
then
be
removed
through
harvested
plants?
Is
that
more
desirable
than
leaving
the
heavy
metals
in
place
and
so-called
trying
to
prevent
future
exposures?
Refer
to
and
revise
all
parts
of
this
document
that
claims
the
current
regulatory
process
is
adequate
in
protecting
human
health.
I
4.G-80
Surface
Water
Management
"Leachate
seeps
in
the
Central
Drainage
Channel
and
Brisbane
Lagoon
....
reconstructing
the
channel
and
installing
a
layered
lining
system
that
includes
a
barrier
membrane
to
ensure
that
the
Central
!324
5-226