BCC
unreported
leak
in
1999,
(under
a
tank
that
needed
to
be
repaired)
and
an
October
2003
spill
of
"2400
gallons,
but
1600
were
contained
in
a
second
concrete
basin."
(Correspondence
Alec
Naugle
to
Charles
Ice
10/31,2003
4:55pm)
Ten
years
later,
they
might
be
decreasing,
yet
the
threat
of
insidious
leaks
in
an
aging
system
is
not
mentioned
in
this
document.
4.G-77
Impact
Assessment
Methodology
General
Approach
314
cont.
"The
EDR
database
was
used
to
identify
hazards
...
"
"Figure
4.G-2
shows
the
location
of
these
sites."
There
is
no
Figure
4.G-2.
Figure
4.G
is
now
a
-.2a
and
-.2b.
You
might
be
referring
to
Figure
4.G-7.
315
"
...
regardless
of
potential
differences
in
cleanup
levels
...
other
hazards,
...
would
be
similar
for
all
four
development
scenarios."
This
is
not
correct.
Lower
commercial
use
densities,
fewer
industrial
uses,
fewer
sensitive
receptors,
and
reduced
transportation
of
toxic
or
hazardous
substances
would
make
the
Community
desired
plan
have
fewer
impacts.
More
open
space
would
mean
fewer
chances
for
exposure
to
toxins.
Grouping
all
plans
as
equal
means
their
differences
are
unrecognized
and
therefore
not
mitigated.
4.G-78
Remedial
Actions
on
the
Project
Site
316
"Remedial
actions
required
for
the
former
Brisbane
Landfill,
OU-1,
and
OU-2
would
be
completed
prior
to
development.
..
"
Prior
to
ALL
development?
Would
be
or
should
be?
The
discussion
of
phasing
cleanups
needs
to
occur
under
"Approach
to
Analysis."
Phased
development
with
phased
remediation
may
put
current
and
new
workers
at
risk
of
several
avenues
of
exposure.
317
3rd
bullet
"Hydrologic
connectivity
to
groundwater
and
surface
water
(primarily
the
Central
Drainage
Canal),"
Refer
to
G.F.
Lee's
comments
about
the
underlying
groundwater
issues.
Failure
to
consider
the
impacts
of
the
surcharging
operation
and
lack
of
waste
containment
will
continue
to
put
the
public
and
environment
at
risk.
318
4.G-79-80
"Operation
and
maintenance
of
the
existing
Leachate
Seep
Collection
and
Transmission
System
...
[Continued]
operation
and
maintenance
of
the
landfill
Gas
Collection
and
Control
System
...
"
"Final
Closure
and
Post-Closure
Maintenance
Plan
(Burns
and
McDonnell,
2002b),
Just
the
continuation
of
the
operation
and
maintenance
of
the
319
5-225
Previous Next