BBCAG
BBCAG
comments
on
DEIR
23
January
2014
page
61
BBCAG
members
recommend
natural
and
engineered,
duplicate
and
redundant
containment
and
filtration
systems
because
of
the
variety
of
pollutants
that
may
be
discharged
from
this
site
dur-
ing
and
post
construction.
Dewatering
to
the
storm
drain
system
was
not
allowed
for
the
Sunnydale
Sewer
Project
and
for
similar
reasons,
should
not
be
suggested
or
allowed
here.
Subject:
4.H-23
Comment:
"Activities
that
take
place
at
indus
trial
facilities
within
the
Project
Site
...
"
are
lim-
ited
and
the
increase
of
proposed
industrial
uses
must
be
spelled
out
in
this
document.
Only
a
small
area
along
Beatty
Way
is
designated
for
industrial
uses
in
our
current
General
Plan.
Subject:
4.H-24,
Mitigation
Measure
4.H-lc:
''.
..
a
Final
Stormwater
Management
Plan
(SMP)
in
accordance
with
the
most
recent
NPDES
C.3
requirements
to
be
reviewed
and
approved
by
the
City
Engineer
...
"
and
later
.
..
"The
SMP
shall
be
developed
in
conjunction
with
the
Storm
Drain
Master
Plan
...
"
Comment:
These
are
the
kinds
of
plans
that
need
to
be
reviewed
by
Environmental
Engineers
in
addition
to
civil
engineers.
Input
should
come
from
BCDC
and
San
Francisco
Bay
Estuary
Pro-
ject
Scientists
or
the
City's
own
advisory
groups,
Open
Space
and
Ecology
Committee
or
asso-
ciation
with
a
non-profit
group.
Using
technological
support
from
Bay
conservation
communi-
ties
would
improve
the
mitigations
suggested.
Subject:
4.H-25,
Depletion
of
Groundwater
Supplies
Comment:
"
The
City
does
not
have
its
own
groundwater
supplies
"
and
"there
are
no
down-
stream
users
of
groundwater
...
"
are
inaccurate
statements.
The
City
doesn
't
utilize
its
authority
to
use
groundwater
in
the
public'
s
interest
and
fish,
ducks,
invertebrates
living
in
the
Bay
where
the
groundwater
meets
the
sea
are
all
downstream
users
of
groundwater
passing
through
the
Bay-
lands.
Opportunities
to
recharge
or
chemically
change
groundwater
have
been
used
in
remediation
strategies
on
the
northern,
Schlage,
UPC
OU
areas.
They
may
be
considered
in
several
places
in
the
Baylands
Project
Site
and
must
get
adequate
environmental
review
rather
than
assume
that
any
impacts
"may
be
a
negligible
effect.
"
Subject:
4.H-26,
Changes
to
Existing
Drainage
Patterns:
"
...
a
modified
storm
drainage
system
that
would
be
constructed
in
accordance
with
the
City
's
requirements
...
[impacts]
would
be
less
than
significant.
"
Comment:
See
comments
on
4.H-lc
SMP
(pg
-24)
Changing
drainage
and
groundwater
patterns
may
drain
valuable
wetland
areas
and
must
be
studied
properly.
Subject:
4.H-28ff,
Impact
4.H-4
t
5-148