BBCAG
BBCAG
comments
on
DEIR
23
January
2014
page
60
Comment:
To
repeat
earlier
concerns
about
the
use
of
the
Brisbane
Storm
Drainage
Master
Plan,
it
has
not
had
full
environmental
review
utilizing
conformance
with
all
General
Plan
Poli-
cies
and
programs.
The
recommendations
may
be
technically
feasible,
confirmed
by
BKF,
but
environmentally
destructive.
The
Baylands
may
need
wider
and
less
uniform
20-foot
wide
channels
as
found
in
Appendix
P,
Infrastructure
Plan.
The
City's
2003
master
storm
drainage
plan
does
not
reflect
current
regulatory
requirements.
The
master
storm
drainage
plan
would
not
be
adequate
to
address
the
changed
conditions
that
would
result
from
implementation
of
the
DSPs
or
CPPs.
In
particular,
raised
and/or
lowered
roadways
and
drainage
of
train
beds
are
not
considered
in
the
Brisbane
Storm
Drainage
Master
Plan,
and
therefore
using
this
plan
for
impact
analysis
is
inadequate.
Subject:
4.H-20:
"The
proximity
of
the
Project
Site
to
the
Bay
reduces
the
chances
that
the
pol-
lutants
in
stormwater
runoff
..
would
be
naturally
attenuated
prior
to
discharge
to
the
Bay.
"
Comment:
Natural
attenuation
is
a
current
remediation
technique
on/adjacent
to
the
Project
Site
and
should
be
noted
somewhere
in
discussion
of
hydrology
and
water
quality
issues
at
the
Bay-
lands.
Subject:
4.H-20,
Contaminated
Groundwater
Encountered
During
Construction:
"In
addition,
the
Recology
site
and
Schlage
Lock
site
located
north
of
the
Project
Site
are
also
undergoing
ac-
tive
groundwater
remediation
...
"
Comment:
Describe
the
active
groundwater
remediation
occurring
at
the
Recology
site.
The
DEIR
does
not
address
any
active
remediation
activities
out
there.
Is
the
Recology
remediation
related
to
an
underground
storage
tank?
281
cont
.
282
Groundwater
levels
vary
seasonally
and
hundreds
of
acres
are
sometimes
inundated
by
surface
water
in
excess
of
thirty-day
wetland
criteria.
The
ponds
serve
for
contaminant
sequestration,
filtering
duties
through
plant
remediation.
All
proposed
digging
or
land
alteration
in
the
area
may
put
workers
or
residents
at
risk
The
document
seems
to
indicate
that
just
shallow
zones
would
encounter
contaminated
ground-
water
during
construction,
however
deeper
pylons,
the
supports
needed
for
the
building
sizes,
heights,
and
densities
proposed,
could
cause
cross-contamination
between
aquifers.
The
Bay
Bridge
and
other
recent
construction
in
SF
use
multiple
spiral
pylons
sunk
into
bedrock.
If
the
proposed
structures
for
the
Bay
lands
would
have
to
penetrate
the
lower
aquifer/water
-bearing
zone
then
the
plans
should
be
changed.
Contamination
of
the
lower
aquifer
should
not
be
al-
lowed.
Subject:
4.H-21
,
Mitigation
Measures
4-Hla
and
1
b
Comment:
A
Statewide
General
SWPP
Permit
is
not
adequate
for
a
site
with
seven
State
Super-
fund
projects
on,
adjacent,
or
upstream
of
the
Project
Site
with
wetland
qualities.
The
potential
release
of
contaminated
ground
and
storm
water
during
and
post
construction
makes
this
project
require
an
individual
permit.
2
8
3
284
5-147