The
staff
could
either
be
hired
or
contracted.
The
monitoring
of
the
Chemicals
of
concern,
other
hazardous
chemicals
and
priority
polluting
metals
must
be
monitored
as
long
as
they
are
present.
Dr.
Lee
stated
that
necessity
in
his
report
which
is
included
in
the
DEIR
Appendices.
The
idea
that
future
residents
or
workers
should
be
left
unprotected
is
unreasonable.
Their
health
and
the
quality
of
the
future
environment
must
be
taken
into
account.
Subject:
Project
alternatives
Comment:
Twelve
million
square
feet
is
too
large.
Open
space
and
open
areas
should
total
49%
of
the
land
area
instead
of
34%.
The
result
would
be
less
pressure
on
everything
and
less
need
for
water
supply
capacity,
sewer
capacity,
more
of
the
cleansing
effects
of
wetlands
which
are
important
for
environmental
quality,
less
pressure
to
place
buildings
or
sensitive
receptors
in
contaminated
areas.
Subject:
Topography
Comment:
The
artificial
topography
proposed
has
the
potential
to
create
multiple
problems.
It
may
create
runoff
and
erosion
problems.
It
will
create
other
connective
problems
with
streets
and
perhaps
utilities.
How
can
it
be
sustainable
to
have
to
pump
water
and
wastewater
up
and
down
hills?
4
cont.
5
6
I
don't
think
the
railroad
tracks
are
moving
so
they
will
have
to
have
a
lined
ditch
and
that
may
create
a
noise
problem
or
a
flooding
problem.
An
impermeable
ditch
will
make
contaminants
accumulate
on
the
upland
side
of
the
train
ditch.
There
are
aesthetic
impacts.
It
may
be
that
the
elevation
changes
occur
too
closely
together.
The
DEIR
should
provide
an
animated
model
of
the
proposed
site
topography
for
people
to
judge
whether
they
are
going
to
feel
uncomfortable
in
the
artificial
topography.
Subject:
2-16,
Section
2.9,
Areas
of
Controversy
and
Issues
to
be
Resolved
Comment:
DEIR
omits
water
and
wastewater
sources,
delivery
and
removal,
and
excess
water
drainage
and
storage.
Subject:
3-7ff,
Section
3.2.1
Site
History
Comment:
On
the
CD
that
accompanied
paper
copies
of
the
DEIR,
under
Volume
3,
on
page
850
(following
the
2012
Geosyntec
Hazardous
Materials
Summary
Report
for
the
Landfill),
are
historic
photos
of
the
landfill.
7
Photo
3
purports
to
show
phase
1
of
Landfill
in
the
1920's,
but
the
Landfill
didn't
begin
until
1930
so
what
is
this
fill
and
where
did
it
come
from?
This
means
that
rail-yard
where
the
tracks
are
located
is
underlain
by
a
landfill
of
some
kind
and
that
it
was
being
filled
in
the
1920
's
well
after
the
1906
earthquake.
How
far
north
is
this
photo?
Is
it
San
Francisco?
An
explanation
of
this
contradiction
is
needed.
8
5-89
Previous Next