2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
site
will
be
required
to
avoid
erosion,
and
to
be
designed
so
as
to
avoid
long-term
erosion
hazards.
Noise
issues
are
addressed
in
Section
4.J,
Noise
and
Vibration
,
of
the
Draft
EIR.
Raising
ground
levels
adjacent
to
the
Caltrain
tracks,
along
with
the
construction
of
buildings
within
the
Baylands,
will
provide
partial
attenuation
of
noise
generated
by
Caltrain
operations.
The
analysis
undertaken
for
the
Draft
EIR
did
not
incorporate
such
attenuation
into
noise
modeling
when
evaluating
Project
Site
development-related
impacts
and
is
therefore
conservative.
The
visual
simulations
set
forth
in
Table
4.A-1
include
proposed
site
grading.
As
is
evident
from
these
visual
simulations,
the
primary
visual
impacts
of
Project
Site
development
result
from
building
construction
rather
than
site
grading.
Thus,
additional
visual
modeling
of
proposed
site
elevations
is
unnecessary.
BBCAG-7
[See page
5-89 for the original comment]
This
comment
provides
no
rationale
as
to
why
wastewater
and
drainage
should
be
considered
to
be
“major
areas
of
controversy.”
However,
based
on
comments
received
on
the
Draft
EIR
from
various
agencies,
a
new
bullet
point
is
added
to
the
listing
of
major
areas
of
controversy
on
Page
2-17.
The
added
bullet
point
reads
as
follows.
Water
Supply
,
including
the
diversion
of
water
from
rivers,
along
with
the
transport
and
storage
of
the
proposed
water
supply
for
the
Brisbane
Baylands.
BBCAG-8
[See page
5-89 for the original comment]
Because
landfilling
actually
started
in
the
1930s,
Photographs
2
and
3
in
the
Geosyntec
report
depict
operations
in
the
mid-1930s.
[See page
5-90 for the original comment]
The
portion
of
the
OU-1
within
San
Francisco
(Schlage
Lock)
is
not
a
part
of
the
Project
Site.
The
portion
of
OU-1
within
the
City
of
Brisbane
is
part
of
the
Project
Site.
The
term
“OU
-
1,”
as
used
in
the
Draft
EIR
refers
to
the
Brisbane
portion
of
that
operating
unit.
“OU
-
1”
in
the
Draft
EIR
thus
refers
consistently
to
the
portion
of
OU-1
within
the
Baylands
Project
Site.
The
portion
of
OU-1
that
is
north
of
and
outside
of
the
Baylands
is
consistently
referred
to
in
the
Draft
EIR
as
either
the
San
Francisco
portion
of
OU-1
or
the
Schlage
Lock
portion
of
OU-1.
Please
note
the
contaminated
groundwater
underlying
the
San
Francisco
(Schlage
Lock)
portion
of
OU-1
has
contributed
to
groundwater
contamination
underlying
the
Baylands
Project
Site.
BBCAG-9
BBCAG-10
[See page
5-90 for the original comment]
The
graphics
provided
in
Chapter
3,
Project
Description
,
depict
proposed
open
space
features
to
the
extent
possible
given
the
available
detail
of
concept
plan
scenarios
for
Baylands
development.
In
Brisbane
Baylands
Final
EIR
2.9.1-2
May
2015
Previous Next