Mr.
John
Swiecki/City
of
Brisbane
January
28,
2014
Page
2
Caltrans
generated
traffic
of
Table
4.N-15
versus
that
ofITE
for
Community
Proposed
Plan
(CPP)
instance:
a.
Retail
AM
(PM)
generated
trips
by
equation
as
587
(1440)
in
Table
versus
950
(5059)
vehicles
per
hour
(vph)
by
ITE,
b.
Office
AM
(PM)
generated
trips
by
equation
as
957
(866)
in
Table
versus
1176
(1191)
vph
by
ITE,
c.
R
&
DAM
(PM)
generated
trips
by
equation
as
1426
(1105)
in
Table
versus
1755
(1519)
vph
by
ITE,
d.
Hotel
AM
(PM)
generated
trips
by
rate
as
1026
(1048)
in
Table
versus
1333(1393)
vph
by
ITE,
e.
Public/civic/cultural,
land
use
code=814,
AM
(PM)
generated
trips
by
rate
as
314
(286)
in
Table
versus
n/a
(512)
vph
by
ITE,
f.
Conference
Exhibition,
land
use
code=814,
AM
(PM)
generated
trips
by
rate
as
457
(417)
in
Table
versus
n/a
(745)
vph
by
ITE,
g.
Entertainment/cultural,
land
use
code=814,
AM
(PM)
generated
trips
by
rate
as
1017
(928)
in
Table
versus
n/a
(1605)
vph
by
ITE,
We
recommend
revising
the
study's
AM
(PM)
generated
traffic
to
the
ITE
Trip
Generation,
8th
edition,
accordingly.
2.
Turning
Traffic
Diagram
per
Study
Intersection
under
Various
Conditions.
Please
provide
turning
traffic
diagrams
for
study
intersection
under
Existing,
Project
Only,
Cumulative,
Cumulative+
Project
Conditions.
3
cont.
Cultural
Resources
There
are
no
known
archaeological
sites
within
the
State
right-of-way
(ROW)
in
the
project
area.
However,
should
ground-disturbing
activities
take
place
as
part
of
this
project
within
the
State
ROW
and
there
is
an
inadvertent
archaeological
or
burial
discovery,
in
compliance
with
California
Environmental
Quality
Act,
Section
5024.5
of
the
California
Public
Resources
Code,
and
Volume
2
of
the
Caltrans
Standard
Environmental
Reference
(http://ser.dot.ca,gov),
all
construction
within
100
feet
of
the
find
shall
cease.
The
Caltrans
Office
of
Cultural
Resource
Studies,
District
4,
shall
be
immediately
contacted
at
(510)
286-5416.
A
staff
archaeologist
will
evaluate
the
finds
within
one
business
day
after
contact.
Archaeological
resources
may
consist
of,
but
are
not
limited
to,
dark,
friable
soils,
charcoal,
obsidian
or
chert
flakes,
grinding
bowls,
shell
fragments,
or
deposits
of
bone,
glass,
metal,
ceramics,
or
wood.
5
Hydraulics
Please
provide
the
Drainage
Plans
and
Drainage
Report
containing
the
hydrological
calculations
showing
the
before
and
after
for
the
post
project
runoff.
Any
increase
in
storm
water
runoff
from
this
proposed
development
may
impact
the
design
capacity
of
the
State's
existing
drainage
system
and
will
need
to
be
mitigated.
6
Trip
Reduction
In
order
to
reduce
impacts
on
US-101,
we
suggest
that
the
City
of
Brisbane
refer
to,
"Reforming
Parking
Policies
to
Support
Smart
Growth,"
an
Metropolitan
Transportation
i
7
"Ca/trans
improves
mobility
across
California
"
5-4
Previous Next