2.
Response
to
Comments
2.5
Individual
Responses
to
Comments
from
State
Agencies
See
Technical
Appendix
K
includes
the
Traffix
outputs
from
the
intersection
analyses.
These
output
sheets
provide
the
volumes
for
all
turning
movements,
for
each
study
intersection,
for
all
development
scenarios.
Mitigation
Measure
4.D-2
addresses
actions
to
be
taken
in
the
event
that
previously
unknown
archaeological
resources
are
found.
Because
the
portions
of
State
rights-of-way
within
the
Baylands
are
located
on
fill
material,
the
potential
for
finding
such
resources
is
extremely
low.
Nevertheless,
should
previously
unknown
archaeological
resources
be
found,
Caltrans
District
4
will
be
notified,
and
the
requirements
of
Mitigation
Measure
4.D-2
will
be
implemented.
Prior
to
the
approval
of
any
site-
specific
development
that
might
increase
stormwater
runoff
onto
Caltrans
rights-
of-way,
the
City
will
provide
Caltrans
with
hydrological
calculations
and
improvement
plans
demonstrating
that
(1)
stormwater
runoff
from
proposed
Baylands
development
will
not
exceed
the
design
capacity
of
the
State’s
existing
drainage
system
or
(2)
appropriate
improvements
will
be
provided
to
protect
Caltrans’
property
from
flooding.
Any
improvements
to
Caltrans
drainage
facilities
will
be
subject
to
approval
by
Caltrans.
See
also
Response
Caltrans
8.
Parking
strategies
to
reduce
Project
Site
traffic
generation
such
as,
but
not
limited
to,
reducing
parking
ratios,
will
be
considered
as
part
of
site-specific
development
projects
and
preparation
of
required
TDM
plans
to
ensure
the
appropriateness
of
parking
requirements
to
the
specific
uses
proposed
in
their
specific
locations.
The
City
will
not
permit
any
construction
activities
that
may
encroach
into
Caltrans
right-of-way
unless
an
encroachment
permit
has
first
been
secured
from
Caltrans.
Comment
does
not
raise
any
significant
environmental
issues
regarding
the
adequacy
of
the
Draft
EIR
or
its
analyses
and
conclusions.
Brisbane
Baylands
Final
EIR
2.5.1-3
May
2015