4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Noise
and
Vibration
(cont.)
piles),
alternative
foundation
types
for
the
new
construction
(e.g.,
spread
footings
versus
driven
piles),
alternative
compaction
methods,
and
physical
measures
(intervening
trench,
increased
distance).
Require
monitoring
to
be
conducted
at
the
building
during
construction.
This
monitoring
can
include
crack
gages
on
existing
cracks
and
vibration
amplitude
monitoring.
Establish
warning
and
stop
work
thresholds
for
monitoring.
Implement
visual
and
audible
signals
that
are
triggered
by
a
vibration
monitor
when
exceedances
of
warning
and
stop
work
thresholds
occur.
If
warning
thresholds
are
exceeded
routinely,
consider
alternative
construction
approaches.
If
the
stop
work
threshold
is
exceeded,
evaluate
the
condition
of
the
building
for
damage.
If
no
damage
is
indicated
consult
with
structural
engineer
and/or
architectural
historian
to
assess
whether
higher
thresholds
are
possible
and
adjust
as
appropriate.
If
damage
occurs
determine
if
any
other
construction
approaches
are
feasible
to
reduce
vibration.
If
none
is
available
examine
the
severity
of
the
damage
to
determine
if
damage
is
minor
and
repair
is
feasible.
If
repair
is
feasible
continue
with
construction,
but
monitor
vibration
and
damage
closely
to
ensure
that
damage
remains
repairable.
Consider
whether
a
lower
stop
work
threshold
is
feasible.
If
damage
approaches
becoming
unrepairable
and
vibration
levels
have
approached
or
exceeded
the
stop
work
threshold
repeatedly,
reconsider
construction
of
the
project.
Repair
any
damage
that
has
occurred.
Building
shall
be
undertaken
during
pile-
driving
activities
to
inspect
for
damage.
Should
damage
to
the
Roundhouse
or
the
Machinery
&
Equipment
building
due
to
pile-driving
activities
be
detected,
construction
shall
be
halted
until
damage
is
repaired
and
modified
pile-
driving
protocols
or
alternatives
methods
are
implemented
to
avoid
further
damage.
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Brisbane
Baylands
Final
EIR
4-69
May
2015