4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Surface
Water
Hydrology
and
Water
Quality
(cont.)
Increase
in
the
amount
of
runoff
and
potential
flooding.
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.H-4a:
Prior
to
issuance
of
a
building
permit,
all
site-
specific
development
plans
within
the
Project
Site
shall
include
systemwide
drainage
improvements
that
shall
accommodate
all
increased
runoff
in
accordance
with
City
requirements
and
correct
known
existing
deficiencies
(e.g.,
Levinson
Overflow
Area
and
the
PG&E
property).
On-site
storm
drainage
collection
facilities
shall
be
sized
to
convey
the
peak
flow
rate
from
a
25-year
storm
event
entirely
within
the
piping
system
such
that
Baylands
roadways
and
recreational
facilities
are
not
flooded.
Drainage
improvements
shall
accommodate
the
100-year
peak
storm
event
within
the
piping
system
and
within
streets
such
that
building
finished
floor
elevations
provide
a
minimum
of
1-foot
of
freeboard
above
the
100-year
storm
event
hydraulic
grade
line
water
elevation
with
tidal
flow
and
100
years
of
estimated
sea
level
rise.
Key
roadways
including
Sierra
Point
Parkway,
Lagoon
Road,
and
Tunnel
Avenue
shall
be
designed
such
that
these
roadways
are
available
as
evacuation
routes
in
the
event
of
a
100-year
storm
event.
The
proposed
system
design
shall
be
submitted
to
the
City
Engineer
for
approval
and
shall
hydraulically
isolate
existing
drainage
inlets
fronting
Levinson
Overflow
Area
and
the
PG&E
property
from
existing
Brick
Arch
Sewer
system.
4.H-4b:
Prior
to
issuance
of
a
building
permit,
all
site-
specific
development
plans
within
the
Project
Site
shall
include
additional
conveyance
capacity
by
incorporating
new
storm
drain
facilities
along
Bayshore
Boulevard
north
of
Industrial
Avenue.
Development
plans
shall
also
require
addition
of
a
new
inlet
near
the
Bayshore
Boulevard
and
Industrial
Way
intersection
that
is
large
enough
to
intercept
surface
flows
from
Levinson
Overflow
Area
and
the
PG&E
property
in
accordance
with
and
as
approved
by
the
City.
Review
and
approval
by
the
City
engineer
shall
be
required
to
confirm
that
conveyance
capacity
is
sufficient
to
accommodate
the
100-year
peak
storm
event
within
the
piping
system
and
streets
such
that
building
finished
floor
elevations
provide
a
minimum
of
1-foot
of
freeboard
above
the
100-year
storm
event
hydraulic
grade
line
water
elevation
with
tidal
flow
and
100
years
of
estimated
sea
level
rise.
Applicants
for
site-specific
development
City
of
Brisbane
City
Engineer
The
City
Community
Development
Director
shall
prepare
conditions
of
approval
for
all
site
specific
development
to
require
installation
of
such
systemwide
drainage
improvements
as
are
needed
to
accommodate
increased
runoff,
achieve
the
performance
standards
of
Mitigation
Measure
4.H-
4a,
and
correct
known
existing
deficiencies
to
the
satisfaction
of
the
City
Engineer
in
compliance.
Installation
of
drainage
improvements
to
the
satisfaction
of
the
City
Engineer.
Increase
in
the
amount
of
runoff
and
potential
flooding.
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
Applicants
for
site-specific
development
City
of
Brisbane
City
Engineer
The
City
Community
Development
Director
shall
prepare
conditions
of
approval
for
site-specific
development
to
require
installation
of
new
storm
drain
facilities
along
Bayshore
Boulevard
north
of
Industrial
Way,
including
a
new
inlet
near
the
Bayshore
Boulevard
and
Industrial
Way
intersection
that
is
large
enough
to
intercept
surface
flows
from
Levinson
Overflow
Area
and
the
PG&E
property
to
achieve
the
performance
standards
of
Installation
of
new
storm
drain
facilities
along
Bayshore
Boulevard
north
of
Industrial
Way,
including
a
new
inlet
near
the
Bayshore
Boulevard
and
Industrial
Way
intersection
to
intercept
surface
flows
from
Levinson
Overflow
Area
and
the
PG&E
property
and
provide
adequate
conveyance
capacity
to
the
satisfaction
of
the
City
Engineer.
Brisbane
Baylands
Final
EIR
4-60
May
2015