4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Surface
Water
Hydrology
and
Water
Quality
(cont.)
RWQCB.
Site
dewatering
activities
shall
also
be
monitored
by
a
state
licensed
geotechnical
engineer
in
such
a
manner
as
to
avoid
the
potential
for
damaging
buildings
or
infrastructure
due
to
potential
subsidence
of
the
ground
surface
in
accordance
with
any
requirements
from
the
City
Engineer.
The
City
Engineer
shall
determine
that
a
state
licensed
geotechnical
engineer
will
monitor
dewatering
activities
in
accordance
with
any
requirements
of
the
City
Engineer.
City
of
Brisbane
Community
Development
Director
The
City
Community
Development
Director
shall
prepare
conditions
of
approval
for
all
site
specific
development
to
require
preparation
of
a
Final
Stormwater
Management
Plan
(SMP)
in
accordance
with
the
most
recent
NPDES
C.3
requirements
to
be
reviewed
and
approved
by
the
City
Engineer
prior
to
approval
of
final
design
plans,
along
with
implementation
of
the
approved
plan
in
compliance
with
Mitigation
Measure
4.H-1c.
The
City
Engineer
shall
conduct
such
monitoring
and
require
such
reports
as
necessary
to
demonstrate
compliance
with
the
General
Industrial
Permit
as
approved
by
the
RWQCB
in
an
annual
report
to
be
submitted
each
July
1.
Site-specific
development
in
compliance
with
Mitigation
Measure
4.H-1c
to
the
satisfaction
of
the
City
Engineer.
Compliance
with
water
quality
standards
during
construction
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.H-1c.
Applicants
for
site-specific
development
Applicants
for
site-specific
projects
to
be
constructed
within
the
Project
Site
shall
development
prepare
and
implement
a
Final
Stormwater
Management
Plan
(SMP)
in
accordance
with
the
most
recent
NPDES
C.3
requirements
to
be
reviewed
and
approved
by
the
City
Engineer
prior
to
approval
of
final
design
plans.
The
SMP
shall
be
prepared
by
licensed
professionals
and
act
as
the
guiding
document
detailing
best
management
practices
for
mitigating
water
quality
impacts
in
the
post-construction
phase.
Industrial
uses
shall
prepare
a
SMP
in
accordance
with
NPDES
permit
requirements
for
Industrial
Activity.
Industrial
applicants
shall
include
management
measures
that
will
achieve
the
performance
standard
of
best
available
technology
economically
achievable
and
best
conventional
pollutant
control
technology
in
accordance
with
the
General
Industrial
Permit
as
approved
by
the
RWQCB
and
shall
demonstrate
compliance
within
an
annual
report
be
submitted
each
July
1.
The
SMP
shall
provide
operations
and
maintenance
guidelines
for
all
of
the
BMPs
identified
in
the
SMP,
including
LID
measures
and
other
BMPs
designed
to
mitigate
potential
water
quality
degradation
of
runoff
from
all
portions
of
the
completed
development,
and
shall
clearly
identify
the
entity
responsible
for
the
required
ongoing
maintenance.
The
SMP
shall
be
developed
in
conjunction
with
the
Storm
Drain
Master
Plan
to
ensure
that
the
treatment
designs
support
the
hydraulics
and
hydrology
of
the
proposed
storm
drainage
system.
Brisbane
Baylands
Final
EIR
4-59
May
2015
Previous Next