4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Biological
Resources
(cont.)
Restrictions
on
the
movement
of
wildlife
species
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.C-4f:
Prior
to
tree
removal,
trimming
of
trees
or
shrubs
or
soil
disturbance
for
site
grading,
a
survey
of
suitable
nesting
habitat
shall
be
conducted
by
an
avian
biologist
familiar
with
Bay
Area
species
and
habitats
to
map
the
location
of
vegetation
that
could
support
avian
species.
If
ground-disturbing
activities
or
vegetation
removal
are
proposed
during
the
breeding
bird
season
(January
1
through
September
15),
to
avoid
direct
losses
of
nests,
eggs,
and
nestlings
and
indirect
impacts
on
avian
breeding
success,
a
qualified
avian
biologist
shall
survey
active
sites
for
nesting
raptors
and
passerine
birds
not
more
than
14
days
prior
to
the
ground-disturbing
activity
or
vegetation
removal.
Surveys
shall
include
all
trees
in
line-of-sight
and
within
500
feet
of
construction
for
raptors,
and
all
vegetation
(including
bare
ground
within
250
feet)
for
all
other
species.
If
active
nests
are
found,
tree
removal
or
tree
trimming
and
construction
activities,
including
soil
disturbance,
construction
noise,
increased
human
presence,
would
be
halted
and
the
nest
would
be
monitored
by
a
qualified
biologist
who
shall
verify
when
the
nestlings
have
fledged
and
left
the
nest.
4.C-4g:
Applicants
for
site
specific
development
projects
pursuant
to
an
approved
specific
plan
within
the
Project
Site
shall
take
the
following
measures
to
avoid
direct
mortality
of
roosting
special-status
bats
and
disturbance
of
maternity
roosts
or
winter
hibernacula:
A
bat
biologist
familiar
with
Bay
Area
species
shall
conduct
surveys
of
all
potential
bat
habitat,
including
areas
suitable
for
maternity
roosts
and/or
winter
hibernacula
within
a
site
proposed
for
development
prior
to
initiation
of
construction
activities,
including
initial
grading.
Surveys
shall
be
conducted
within
one
year
prior
to
construction
to
capture
current
bat
habitats
at
the
site,
as
presence
of
bats
could
vary
yearly
and
survey
results
several
years
before
impacts
occur
could
be
inaccurate.
Potentially
suitable
habitat
shall
be
located
visually.
Bat
emergence
counts
shall
be
made
at
dusk
as
the
bats
depart
from
any
suitable
habitat.
In
addition,
an
Baylands
developer
City
of
Brisbane
City
engineer
The
City
Engineer
shall
not
issue
any
permits
for
grading
or
other
ground-
disturbing
activities
that
would
result
in
removal
or
trimming
of
trees
or
shrubs
that
could
serve
as
nesting
habitat
during
the
breeding
bird
season
(January
1
through
September
15)
unless
a
survey
in
compliance
with
Mitigation
Measure
4.C-4f
has
been
completed
by
a
qualified
avian
biologist
not
more
than
14
days
prior
to
the
ground-disturbing
activity
or
vegetation
removal
documenting
that
nesting
birds
will
not
be
affected
by
the
proposed
activities.
Issuance
of
permits
for
grading
or
other
ground-
disturbing
activities
in
compliance
with
Mitigation
Measure
4.C-4f.
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Restrictions
on
the
movement
of
wildlife
species
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
Applicants
for
site
specific
development
City
of
Brisbane
Community
Development
Director
The
City
Community
Development
Director
shall
review
the
surveys
required
by
Mitigation
Measure
4.C-4g
for
compliance
with
the
requirements
of
the
mitigation
measure.
Should
the
surveys
determine
that
bats
could
be
affected
by
proposed
development,
the
Community
Development
Director
shall
consult
with
CDFW
to
determine
appropriate
buffer
areas
and
other
requirements.
The
City
Engineer
shall
not
issue
any
permits
for
Permits
for
grading
or
other
ground-disturbing
activities,
or
for
building
demolition
that
avoid
impacts
to
bats
per
the
provisions
of
Mitigation
Measure
4.C-4g.
Brisbane
Baylands
Final
EIR
4-38
May
2015