3.
Revisions
to
the
Text
of
the
Draft
EIR
TABLE
5.8
(Continued)
COMPARISON
OF
IMPACTS
FOR
PROJECT
SITE
SCENARIOS
AND
ALTERNATIVES
Proposed
Project
Site
Development
Scenario
Impacts
DSP
LTS
DSP-V
LTS
CPP
LTS
CPP-V
LTS
No
Project–General
No
Project–No
Build
Plan
Buildout
Impact:
NA
No
additional
demand
for
wastewater
treatment
would
result.
Impact:
LTS
This
alternative
would
result
in
a
substantially
less
development
than
the
scenarios,
with
substantially
less
demand
for
wastewater
treatment.
Alternatives
Renewable
Energy
Generation
Impact:
LTS
This
alternative
would
result
in
substantially
less
development
than
the
scenarios
with
substantially
less
demand
for
wastewater
treatment.
Reduced
Intensity
Non-Residential
Impact:
LTS
This
alternative
would
result
in
less
development
than
the
scenarios
with
substantially
less
demand
for
wastewater
treatment.
Reduced
Intensity
Mixed
Use
Impact:
LTS
This
alternative
would
result
in
less
development
than
the
scenarios
with
substantially
less
demand
for
wastewater
treatment.
Based
on
existing
and
projected
wastewater
flows
from
the
BSD
and
the
City
to
the
SFPUC,
development
of
the
Project
Site
with
or
without
the
onsite
recycled
water
plant
would
not
exceed
the
BSD’s
or
the
City’s
contractual
capacity
for
wastewater
treatment
by
the
SFPUC.
Recology’s
Impact
4.O-2:
Would
wastewater
discharge
to
the
SFPUC
would
only
the
Project
result
in
a
increase
by
approximately
0.002
mgd.
Therefore,
determination
by
the
adequate
treatment
capacity
at
the
SFPUC
would
wastewater
treatment
be
available
for
wastewater
discharge.
provider
which
serves
or
may
serve
the
Wastewater
generated
by
proposed
development
project
that
it
does
would
be
discharged
into
the
BSD
system
for
not
have
adequate
treatment
at
the
SFPUC
SEP.
Midway
through
capacity
to
serve
the
the
Project
Site
development
buildout
(about
year
project’s
projected
15),
an
onsite
recycled
water
plant
would
be
demand
in
addition
to
constructed
to
produce
recycled
water
for
Project
the
provider’s
existing
site
non-potable
water
needs.
Adequate
commitments?
conveyance
and
treatment
capacity
are
available
in
the
BSD
and
SFPUC
SEP
systems
under
existing
contract
arrangements
to
handle
wastewater
flows
from
Project
Site
development.
As
a
result,
wastewater
flows
from
Project
Site
development
would
be
properly
treated
and
disposed
of
through
facilities
that
comply
with
SFRWQCB
wastewater
treatment
requirements.
Average
Daily
Sewage
Generation
(with
Water
Savings
Program
D)
-Summer
-Winter
Average
Daily
Sewage
Generation
(with
Water
Savings
Program
E)
-Summer
-Winter
Impacts:
SU
–
Significant
Unavoidable
Impact
No
Impact
Brisbane
Baylands
Final
EIR
1.566
1.267
1.606
1.317
1.324
0.839
1.218
0.733
0.908
0.908
0.931
0.931
0.558
0.558
0.461
0.461
LTS
–
Less
than
Significant
Impact
SM
–
Significant,
but
Mitigable
Impact
N/A
–
Not
Applicable
3-205
May
2015
Previous Next