3.
Revisions
to
the
Text
of
the
Draft
EIR
TABLE
5.8
(Continued)
COMPARISON
OF
IMPACTS
FOR
PROJECT
SITE
SCENARIOS
AND
ALTERNATIVES
Proposed
Project
Site
Development
Scenario
Impacts
DSP
DSP-V
CPP
CPP-V
No
Project–General
No
Project–No
Build
Plan
Buildout
require
securing
a
new,
reliable
water
supply,
this
alternative
includes
the
proposed
water
supply
transfer
agreement.
Substantially
less
water
would
need
to
be
imported
for
Project
Site
use,
while
the
water
supply
being
imported
for
General
Plan
Buildout
outside
of
the
Baylands
(400
acre-
feet)
would
remain
the
same.
Alternatives
Renewable
Energy
Generation
require
securing
a
new,
reliable
water
supply,
this
alternative
includes
the
proposed
water
supply
transfer
agreement.
Substantially
less
water
would
need
to
be
imported
for
Project
Site
use,
while
the
water
supply
being
imported
for
General
Plan
Buildout
outside
of
the
Baylands
(400
acre-
feet)
would
remain
the
same.
Reduced
Intensity
Non-Residential
require
securing
a
new,
reliable
water
supply,
this
alternative
includes
the
proposed
water
supply
transfer
agreement.
Substantially
less
water
would
need
to
be
imported
for
Project
Site
use,
while
the
water
supply
being
imported
for
General
Plan
Buildout
outside
of
the
Baylands
(400
acre-
feet)
would
remain
the
same.
Reduced
Intensity
Mixed
Use
require
securing
a
new,
reliable
water
supply,
this
alternative
includes
the
proposed
water
supply
transfer
agreement.
Substantially
less
water
would
be
imported
for
Project
Site
use,
while
the
water
supply
being
imported
for
General
Plan
Buildout
outside
of
the
Project
Site
(400
acre-feet)
would
remain
the
same.
Existing
water
storage
facilities
do
not
have
adequate
capacity
for
the
additional
demand
that
would
be
created
by
Project
Site
development.
Additional
storage
capacity
is
therefore
needed.
EIR
mitigation
requires
that
the
development
applicant
pay
its
fair
share
costs
to
Brisbane
to
develop
the
necessary
storage
capacity.
EIR
mitigation
would
reduce
impacts
to
streamside
meadows
and
other
alluvial
deposits
along
the
Tuolumne
River
due
to
reduced
flow
releases
in
the
reach
of
the
river
below
Hetch
Hetchy
Reservoir
to
New
Don
Pedro
Reservoir
associated
with
the
2
mgd
(2,400
acre-feet
per
year)
OID-Brisbane
water
transfer.
Total
Project
Demand
under
Water
Savings
Program
D
(MGD)
-Summer
-Winter
Total
Project
Demand
under
Water
Savings
Program
E
(MGD)
-Summer
-Winter
0.955
0.955
0.980
0.980
0.588
0.588
0.485
0.485
1.638
1.333
1.691
1.386
1.394
0.883
1.282
0.771
Similar
mitigation
as
Similar
mitigation
as
Similar
mitigation
as
Similar
mitigation
as
for
the
scenarios
for
the
scenarios
for
the
scenarios
for
the
scenarios
would
apply
to
this
would
apply
to
reduce
would
apply
to
this
would
apply
to
this
alternative
to
reduce
impacts
related
to
alternative
to
reduce
alternative
to
reduce
impacts
related
to
water
storage
facilities
impacts
related
to
impacts
related
to
water
storage
facilities
capacity
and
off
site
water
storage
facilities
water
storage
facilities
capacity
and
off
site
impacts
from
the
capacity
and
off
site
capacity
and
off
site
impacts
from
the
proposed
water
impacts
from
the
impacts
from
the
water
transfer.
transfer.
proposed
water
water
transfer.
transfer.
Impacts:
SU
–
Significant
Unavoidable
Impact
No
Impact
Brisbane
Baylands
Final
EIR
SM
–
Significant,
but
Mitigable
Impact
N/A
–
Not
Applicable
LTS
–
Less
than
Significant
Impact
3-204
May
2015