Impact
4.L-1:
Would
the
Project
result
in
substantial
adverse
physical
impacts
associated
with
the
provision
of
new
or
physically
altered
police
facilities,
need
for
new
or
physically
altered
police
facilities,
the
construction
of
which
could
cause
significant
environmental
impacts,
in
order
to
maintain
acceptable
service
ratios,
response
times
or
other
performance
objectives?
Residents
and
Employee
Population
Projected
New
Service
Calls
per
1,000
population
Total
Calls
for
Service
Impacts:
SU
–
Significant
Unavoidable
Impact
No
Impact
Brisbane
Baylands
Final
EIR
Alternatives
No
Project–General
No
Project–No
Build
Plan
Buildout
Renewable
Energy
Generation
Reduced
Intensity
Non-Residential
Reduced
Intensity
Mixed
Use
DSP
9,888
17,540
9,486
DSP-V
9,888
15,466
8,365
CPP
0
16,187
8,755
CPP-V
0
16,069
8,691
SM
SM
SM
SM
Impact:
N/A
Because
no
new
development
would
occur,
no
additional
impacts
related
to
increased
demand
for
police
services
would
result.
Nuisance-
related
activities
associated
with
the
undeveloped
character
of
the
area
would
be
expected
to
continue.
Impact:
SM
This
alternative
would
generate
approximately
3,600
new
jobs
increasing
existing
demand
on
police
services
although
to
a
considerably
lesser
extent
than
the
scenarios.
As
with
all
proposed
development,
preparation
of
a
Police
Services
and
Facilities
Plan
would
be
required
to
determine
(1)
the
timing
and
need
for
additional
police
shifts
and
(2)
if
an
onsite
facility
would
be
needed.
Impact:
SM
This
alternative
would
generate
approximately
3,400
new
jobs
increasing
existing
demand
on
police
services
although
to
a
considerably
lesser
extent
than
the
scenarios.
As
with
all
proposed
development,
preparation
of
a
Police
Services
and
Facilities
Plan
would
be
required
to
determine
(1)
the
timing
and
need
for
additional
police
shifts
and
(2)
if
an
onsite
facility
would
be
needed.
Impact:
SM
This
alternative
would
generate
approximately
9,500
new
jobs
increasing
existing
demand
on
police
services
although
to
a
lesser
extent
than
the
scenarios.
As
with
all
proposed
development,
preparation
of
a
Police
Services
and
Facilities
Plan
would
be
required
to
determine
(1)
the
timing
and
need
for
additional
police
shifts
and
(2)
if
an
onsite
facility
would
be
needed.
Impact:
SM
This
alternative
would
increase
population
by
5,350
new
residents
and
7,200
new
employees
(12,550
total)
increasing
existing
demand
on
police
services
although
to
a
lesser
extent
than
the
scenarios.
As
with
all
proposed
development,
preparation
of
a
Police
Services
and
Facilities
Plan
would
be
required
to
(1)
determine
the
timing
and
need
for
additional
police
shifts
and
(2)
in
an
onsite
facility
would
be
required.
All
scenarios
increase
demand
for
police
services
due
to
an
increase
in
residents
(DSP,
DSP-V)
and
employees
(DSP,
DSP-V,
CPP,
CPP-V)
beyond
the
existing
capacity
of
police
staffing.
Also,
to
ensure
that
centrally
located
police
facilities
are
provided
to
serve
the
Project
site
while
maintaining
adequate
response
times
throughout
the
City,
a
storefront
community
police
facility
would
be
required
within
the
Project
Site,
as
required
by
EIR
mitigation.
Each
specific
plan
for
development
within
the
Project
Site
will
be
required
as
part
of
the
planning
review
process
to
prepare
and
implement
a
Police
Services
and
Facilities
Plan,
subject
to
City
approval,
to
define
specific
timing
requirements
for
establishment
of
additional
police
shifts
based
on
the
progression
of
development.
Implementation
of
mitigation
would
reduce
impacts
to
less
than
significant.
27,428
25,354
16,191
16,073
6,583
9,699
6,085
9,201
3,886
7,002
3,858
6,974
SM
–
Significant,
but
Mitigable
Impact
N/A
–
Not
Applicable
LTS
–
Less
than
Significant
Impact
3-188
May
2015