3.
Revisions
to
the
Text
of
the
Draft
EIR
21-09
which
charges
the
California
Air
Resources
Board
(CARB),
by
July
31,
2010,
to
establish
a
regulation
consistent
with
this
33
percent
target
by
2020.
This
is
a
further
increase
in
renewable
portfolio
standards
(RPS)
over
SB
1078
and
SB
107.
On
a
quarterly
basis,
the
California
Public
Utilities
Commission
reports
to
the
state
legislature
on
progress
toward
the
Renewable
Energy
Portfolio
standards.
At
the
end
of
2012,
the
three
largest
retail
sellers
of
electricity
in
California
served
19.6%
of
their
retail
electric
load
with
RPS-eligible
renewable
energy
(CPUC,
2013).
Pages
4.P-11/12
OSEC-390
[See
page
5-358
for
the
original
comment]
REVISE
the
last
paragraph
on
page
4.P-11
that
continues
onto
page
4.P-12
as
follows:
Two
subsurface
natural
gas
pipeline
pressure
regulation
pits
would
be
constructed
on
the
Project
Site
near
the
tap
and
would
require
an
approximately
20-foot-long-by-45-foot-wide
area
for
installation
and
access
easements
(see
“Proposed
Natural
Gas
System”
on
page
91
of
Appendix
B,
Draft
Brisbane
Baylands
Infrastructure
Plan
).
Page
4.P-13
OSEC-393
[See
page
5-358
for
the
original
comment]
REVISE
the
second
as
follows.
Construction
activities
related
to
installation
of
proposed
electric,
gas,
and
renewable
energy
facilities
would
result
in
significant
impacts
related
to
ground
disturbance,
damage
to
existing
vegetation,
and
construction-
related
traffic,
air
emissions,
and
noise.
These
construction-related
impacts
are
discussed,
and
specific
mitigation
measures
are
proposed,
as
follows,
in
other
sections
of
this
EIR:
Mitigation
Measures
4.B-2a
and
4.B-2b
(construction
air
emissions);
Mitigation
Measures
4.C-1a
through
4.C-
1c
,
Mitigation
Measures
4.C-2a
through
4.C-2c
,
and
Mitigation
Measures
4.C-4d,
4.C-4e,
and
4.C-4f
(biological
resources);
Mitigation
Measures
4.D-2
and
4.D-4
(archaeological
resources
and
human
remains);
Mitigation
Measure
4.E-2a
(ground
settlement);
Mitigation
Measures
4.G-2a,
4.G-2b,
4.G-2d
and
4.G-2f
through
4.G-2h
(hazardous
materials);
Mitigation
Measures
4.J-4a
and
4.J-4b
(construction
period
noise);
and
Mitigation
Measure
4.N-12
(construction
circulation
patterns).
Implementation
of
these
measures
is
recommended
to
reduce
construction
impacts
related
to
the
installation
of
energy
infrastructure
to
less-than-
significant
levels.
See
Sections
4.A
(
Aesthetics
and
Visual
Resources
),
4.B
(
Air
Quality
),
4.C,
(
Biological
Resources
),
and
4.F
(
Greenhouse
Gas
Emissions
)
for
a
discussion
of
operational
impacts
of
renewable
energy
generation
infrastructure
and
facilities
(e.g.,
wind
turbines,
solar
panels)
in
relation
to
Brisbane
Baylands
Final
EIR
3-140
May
2015