OSEC
Open
Space
&
Ecology
CEQA
Comments
on
Brisbane
Baylands
Draft
EIR
-
2013
8.
It
is
stated
that
Samtrans
is
under
capacity,
and
then
that
the
Route
292
that
services
this
area
is
at
capacity
for
the
main
commute
hours.
9.
TDM
plan
is
required
for
each
qualifying
phase
of
the
project.
The
DIER
does
not
explain
what
"Qualifying
phase"
is.
May
be
necessary
to
have
a
standard
for
example
every
3
years
or
qualifying
phase,
which
ever
occurs
first
to
set
non
negotiable
benchmarks.
10.
What
is
the
proposed
fate
of
the
freight
lines
with
servicing
the
project
site?
No
sidings
for
the
train
are
shown.
Their
near
total
absence
leads
the
conclusion
that
they
are
removed;
however
they
are
mentioned
in
the
legend
of
Figure
4.N-15
pg
4.N-57.
11.
What
is
the
housing
to
job
ratio
of
each
of
the
four
San
Francisco
Superdistricts?
What
is
the
basis
for
assuming
Supderdistrict
3
will
capture
the
majority
of
off
site
trips?
12.
No
where
in
the
transportation
section
does
mention
the
ferry
service.
This
is
an
important
service
and
should
be
considered
in
the
EIR.
13.
Current
and
future
considerations
should
be
addressed
such
as
the
demolition
of
Candlestick
Park
stadium
and
subsequent
housing
and
development
at
Candlestick
and
Bayview/Hunter's
Point
that
will
impact
the
Baylands,
Brisbane
and
the
entire
region
in
multiple
ways,
the
least
of
which
is
traffic
congestion.
I
355
I
I
I
I
356
357
358
359
I
I
I
360
Chapter
4.0:
Utilities.
Service
Systems
and
Water
Supply
Page4.0-6
Table
4.0-5
The
year
to
year
deltas
are
.43,
.04,
.02,
.01.
Not
having
had
time
to
read
Appendix
Lin
full,
I'm
left
confused
why
when
Brisbane's'
water
consumption
has
been
trending
downward,
the
consumption
rate
is
expected
to
rise
dramatically
between
2011
and
2015.
Page4.0-
10
Figure
4.0-1.
The
border
around
the
lagoon
is
depicted
the
same
as
a
pipeline,
this
could
be
easily
confusing.
The
lagoon
should
be
depicted
using
a
different
color.
Page
4.0-14
Table
4.0-6
The
table
reads
backwards
into
the
past
contrary
to
other
tables
in
the
DEIR.
This
is
confusing.
Page
4.0-15
The
DEIR
does
not
address
the
concerns
of
leachate
and
effluence
from
wick
drains,
their
disposal
via
the
sewer
system
and
the
production
of
Class
A
and
Class
B
biosolids
that
are
reused
for
land
application.
Page
4.0-15
Sewage
and
stormwater:
During
wet
weather
under
present
conditions,
"If
[combined
sewage/stormwater]
flows
exceed
the
capacity
of
both
treatment
plants
they
are
discharged
directly
to
San
Francisco
Bay
through
the
SFPUC's
near-shore
outfalls"
The
DEIR
does
not
make
clear
whether
the
additional
combined
sewage
and
stormwater
flows
from
the
proposed
development(s)
would
increase
the
likelihood
of
such
direct
discharges
into
the
Bay
during
wet
years,
especially
in
the
15-year
period
before
the
recycled
water
plant
is
scheduled
to
come
online.
The
DEIR
(page
4-0-46)
refers
to
dry
weather
flows
(sewage)
that
would
remain
below
the
city's
contracted
maximum
even
including
the
new
development,
but
it
is
silent
with
respect
to
the
impact
of
combined
sewage
and
stormwater
flows
in
wet
weather
on
the
treatment
facilities,
and
on
the
risks
of
overwhelming
these
facilities.
How
frequent
are
direct
discharges
of
untreated
sewage/stormwater
into
the
Bay
under
present
conditions?
How
might
the
proposed
development
exacerbate
this
problem?
Where
is
the
assessment
of
the
water
treatment
system'
s
capability
to
manage
sewage/stormwater
so
as
to
avoid
discharges
into
the
Bay
of
untreated
effluent
from
not
only
the
proposed
Brisbane
development,
but
from
all
the
other
development
proposed
in
the
near
vicinity
(cumulative
impacts)
during
wet
years?
I
361
362
I
363
364
365
50
5-355