REVISE
Mitigation
Measure
4.N-3g
as
follows:
Mitigation
Measure
4.N-3g:
Prior
to
the
issuance
of
the
first
building
occupancy
permit
for
new
development
other
than
relocation
or
improvement
of
an
existing
use
within
the
Project
Site
Prior
to
issuance
of
occupancy
permits
for
any
site-specific
development
that
would
(1)
result
in
reducing
the
intersection
to
below
the
acceptable
LOS
standard,
or
(2)
contribute
additional
traffic
to
the
intersection
if
it
is
already
operating
below
the
acceptable
LOS
standard,
signal
timing
settings
at
the
Carter
Street/Geneva
Avenue
intersection
shall
be
modified
by
the
City
and
County
of
San
Francisco
to
provide
longer
green
time
on
eastbound/westbound
permitted
movements
and
longer
cycle
length.
Page
4.N-128
[See
page
for
the
original
comment]
REVISE
the
last
paragraph
as
follows:
The
impact
analysis
of
arena
events
under
Cumulative
(2030)
conditions
with
the
DSP-V
scenario
assumed
a
weekday
evening
sold-out
event
at
the
approximately
17,000-seat
arena.
22
Although
no
specific
program
has
been
developed
for
events
at
the
arena,
it
is
anticipated
that
up
to
150
events
could
occur
at
the
arena
annually.
It
is
no
known
how
many
sold-out
events
with
17,000
attendees
would
occurring
during
weekday
evenings
would
likely
be
infrequent.
Smaller-sized
events
during
weekday
evenings
and
events
occurring
during
the
day
and
on
weekends
would
have
fewer
impacts
due
to
the
lower
traffic
volumes
demands
on
the
study
area
roadways.
Page
4.N-134
[See
page
for
the
original
comment]
REVISE
the
fourth
full
paragraph
as
follows:
In
addition,
the
added
Caltrain
ridership
would
generate
a
substantial
increase
in
“farebox”
revenue
for
Caltrain
(a
beneficial
impact),
potentially
generating
several
million
dollars
annually.
Based
on
the
CPP
and
CPP-V
scenario
ridership
forecasts,
approximately
three
million
annual
trips
would
be
made
via
Caltrain
to/from
the
Bayshore
Station,
potentially
generating
over
$10
million
in
annual
revenue
(while
the
DPP
and
DPP-V
scenarios
could
generate
over
$6
million
in
annual
revenue).
Page
4.N-136
[See
page
for
the
original
comment]
REVISE
the
last
paragraph
to
read:
During
most
hours
of
operation,
two
trains
per
hour
operate
in
both
directions,
with
one
Local
train
making
all
stops
including
the
Bayshore
Station
and
one
Limited
train
that
does
not
stop
at
the
Bayshore
Station.
During
peak
commute
periods,
additional
Baby
Bullet
trains
provide
two
to
three
additional
trains
per
hour
in
both
directions,
although
the
Baby
Bullet
Brisbane