3.
Revisions
to
the
Text
of
the
Draft
EIR
Geology,
Soils,
and
Seismicity
Page
4.E-38
[See
page
for
the
original
comment]
ADD
text
to
the
third
paragraph
as
follows:
Under
Order
01-041
from
the
RWQCB
(2001),
clay
cap
material
must
be
maintained
over
landfill
materials
and
undeveloped
or
open
space
areas.
“If
the
cap
should
be
breached
(i.e.,
damaged
such
that
its
original
purpose
is
compromised)
by
any
means
(differential
settlement,
construction,
plantings,
etc.),
adequate
restorative
measures
are
required
by
Order
01-041
to
maintain
the
integrity
of
the
cap.”
Page
4.E-39
[See
page
for
the
original
comment]
REVISE
Mitigation
Measure
4.E-2a
as
follows:
Mitigation
Measure
4.E-2a:
Prior
to
the
issuance
of
a
grading
permit,
applicants
for
all
site-specific
development
and
infrastructure
projects
within
the
Project
Site,
including
structures,
utilities,
and
roadways
shall
submit
to
the
City
Engineer
a
final
design-level
geotechnical
report
prepared
by
a
licensed
geotechnical
or
soil
engineer
experienced
in
construction
methods
on
fill
materials
in
an
active
seismic
area.
The
report
shall
provide
site-
specific
construction
methods
and
recommendations
regarding
grading
activities,
fill
placement,
soil
corrosivity/expansion/erosion
potential,
compaction,
foundation
construction,
drainage
control
(both
surface
and
subsurface),
and
avoidance
of
settlement,
liquefaction,
differential
settlement,
spread
of
leachate
outside
of
the
former
landfill,
and
seismic
hazards
in
accordance
with
current
California
Building
Code
requirements
including
Chapter
16,
Section
1613.
The
report
shall
also
require
that
all
subsurface
improvements
such
as
utilities
that
include
any
materials
susceptible
to
corrosive
effects
would
be
engineered
in
conformance
with
the
most
recently
adopted
California
Building
Code
requirements
including
the
use
of
engineered
backfill.
The
report
shall
also
include
stability
analyses
of
final
design
cut
and
fill
slopes,
including
recommendations
for
avoidance
of
slope
failure(s).
The
final
grading
plan
and
associated
development
elements
including
the
landfill
cap
layer
shall
be
designed
and
constructed
in
accordance
with
requirements
of
the
final
design-level
geotechnical
investigation
as
approved
by
the
City
Engineer
prior
to
the
issuance
of
any
building
permits.
Designers
and
contractors
shall
comply
with
recommendations
of
the
design-level
geotechnical
investigation
during
pProject
construction
including
any
modifications
required
by
the
City
Engineer.
A
licensed
geotechnical
or
soil
engineer
shall
monitor
earthwork
and
construction
activities
to
ensure
that
recommended
site-specific
construction
methods
are
followed
during
Project
construction.
These
recommendations
shall
be
incorporated
into
all
development
plans
submitted
and
approved
for
the
Project
Site
development
as
conditions
of
approval.
Brisbane
Baylands
Final
EIR
3-78
May
2015