Master Response 28
–
REVISE
the
first
full
paragraph
as
follows:
Brisbane
has
negotiated
a
term
sheet
with
OID
for
the
proposed
water
transfer.
Brisbane
is
responsible
for
establishing
a
transfer
agreement
with
MID
and
a
wheeling
agreement
with
the
SFPUC
to
provide
for
the
conveyance
of
the
OID
water
transfer
to
Brisbane.
Implementation
of
the
proposed
water
transfer/supply
agreement
will
require
approvals
of
final
Water
Supply
and
Conveyance
Agreements
between
Brisbane
and
OID,
between
OID
and
MID,
and
between
Brisbane
and
the
SFPUC
for
individual
portions
of
the
proposed
water
transfer.
These
Water
Supply
and
Conveyance
Agreements
will
contain
provisions
stating
that
the
delivery
of
water
from
OID
through
MID
and
the
SFPUC
to
Brisbane
will
not
be
permitted
to
impair
the
ability
of
MID
or
the
SFPUC
to
deliver
water
to
their
existing
customers.
Pages
3-77,
78
Master Response
1
-
REVISE
the
text
starting
with
the
last
paragraph
on
page
3-77
and
continuing
on
page
3-78
as
follows:
Section
15168
of
the
CEQA
Guidelines
defines
a
program
EIR
as
an
EIR
that
may
be
prepared
on
a
series
of
actions
that
can
be
characterized
as
one
large
project
and
are
related
either
(1)
geographically;
(2)
as
logical
parts
in
the
chain
of
contemplated
actions;
(3)
in
connection
with
issuance
of
rules,
regulations,
plans,
or
other
general
criteria
to
govern
the
conduct
of
a
continuing
program;
or
(4)
as
individual
activities
carried
out
under
the
same
authorizing
statutory
or
regulatory
authority
and
having
generally
similar
environmental
effects
that
can
be
mitigated
in
similar
ways.
Insofar
as
the
components
of
the
Project
Site
development,
as
approved,
would
include
a
plan
and
policy
framework
that
would
govern
future
development
within
a
discrete
geographic
area
within
Brisbane
(and
an
adjacent
portion
of
San
Francisco
and
other
offsite
infrastructure
locations),
such
a
program-level
approach
is
considered
appropriate.
Future
site-specific
development
projects
that
would
fall
within
the
purview
of
this
program-level
analysis
would
undergo
further
environmental
analysis
be
evaluated
in
light
of
the
program
EIR
to
determine
whether
their
implementation
would
require
preparation
of
an
additional
subsequent
or
supplemental
environmental
analysis
documentation
under
CEQA.
Additional
CEQA
compliance
documentation
for
site-specific
development
projects
or
implementing
activities
components
proposed
under
the
selected
Concept
Plan
scenario
would
be
required
where
the
site-specific
impacts
of
the
development
proposal(s)
or
implementing
activity
were
not
addressed
at
a
sufficient
level
of
detail
in
this
program
EIR,
or
in
the
event
subsequent
changes
are
proposed
to
the
Project
Description
selected
scenario
that
were
not
analyzed
in
this
EIR.
This
includes
those
proposed
actions
over
which
other
agencies
have
approval
authority,
such
as
the
proposed
remedial
actions
overseen
by
the
RWQCB,
the
San
Mateo
Brisbane
Baylands
Final
EIR
3-32
May
2015
Previous Next