activities.
The
duration
of
pile
driving
activities
depends
on
a
number
of
factors
including
building
design
and
location,
as
well
as
depth
to
bedrock.
It
can
reasonably
be
expected
that
a
substantial
multi-story
structure
may
require
multiple
weeks
of
pile
driving
during
which
peak
noise
levels
will
exceed
90
dBA.
BCC-450
[See page
5-248 for the original comment]
Typical
noise
levels
from
pile
driving
were
presented
in
Table
4.J-7
of
the
Draft
EIR.
Standard
construction
equipment
(i.e.,
equipment
other
than
pile
drivers)
would
generate
the
noise
levels
shown
in
Table
4.J-8.
[See page
5-248 for the original comment]
Mitigation
Measure
4.J-4b
is
presented
on
Draft
EIR
page
4.J-35.
The
first
paragraph
of
page
4.J-34
is
revised
to
read
as
follows:
To
ensure
that
construction
noise
is
minimized
under
construction
of
Project
Site
development,
Mitigation
Measure
4.J-5b
4.J-4b
below
is
recommended.
BCC-452
BCC-453
[See page
5-249 for the original comment]
Please
refer
to
Response
BCC-449.
[See page
5-249 for the original comment]
The
intent
of
the
mid-day
restriction
on
pile
driving
discussed
in
Mitigation
Measure
4.J-4a
of
the
Draft
EIR
is
to
accommodate
a
relief
from
pile
driving
noise
during
a
typical
lunch
hour.
The
mitigation
measure
would
permit
pile
driving
and/or
other
extreme
noise-
generating
activities
(greater
than
90
dBA)
between
8:00
a.m.
and
12:30
p.m.
and
between
1:30
p.m.
and
4:00
p.m.
Monday
through
Friday.
[See page
5-249 for the original comment]
The
following
table
is
added
as
a
text
amendment
after
the
first
paragraph
of
Draft
EIR
page
4.J-36
to
read
as
follows:
TABLE
4.J-9
CONSTRUCTION
HOURS
ALLOWED
BY
MITIGATION
MEASURE
4.J-4A
Day
of
the
Week
Standard
Construction
Permitted:
Pile
Driving
and
other
extreme
noise-
generating
activities
(greater
than
90
dBA)
permitted:
Monday
through
Friday
7:00
a.m.
to
7:00
p.m.
8:00
a.m.
12:30
p.m.
and
1:30
p.m.
to
4:00
p.m.
Saturday,
Sunday
and
Holidays
9:00
a.m.
to
7:00
p.m.
None
BCC-451
BCC-454
BCC-455
[See page
5-249 for the original comment]
Long-term
construction
activities
under
development
plans
typically
occur
in
isolated
phases
as
discussed
in
Section
3.14
of
the
Draft
EIR.
The
first
phase
of
development
would
occur
on
the
former
railyard
portion
of
the
Baylands
Project
Site
and
would
proceed
eastward
from
there.
These
structures
constructed
in
earlier
phases
would
provide
some
Brisbane
Baylands
Final
EIR
2.9.2-127
May
2015
Previous Next