BCC
Current
daytime
monitored
noise
levels
on
the
site
are
not
relevant
since
activities
are
presently
quite
limited
compared
to
what
would
be
anticipated
after
develop-
ment.
These
projections
should
be
analyzed.
Noise
levels
cited
in
table
appear
to
be
understated
as
they
do
not
take
into
ac-
count
unique
topography
of
Brisbane
being
a
parabolic
basin.
These
should
be
re-
ical
Con-
vised.
1442
Need
to
identify
where
closest
sensitive
land
use
receptors
to
pile-driving
"1600
feet
away"
would
be
located.
Need
to
cite
source
of
assertion
that
noise
at
this
location
would
be
attenuated
to
73
OBA,
that
being
similar
intensity
to
high-volume
roadway
traffic
and
not
con-
sidered
significant.
Refer
to
Brisbane
General
Plan
policy
176,
183,
and
184.
Further
studies/research
are
necessary
in
this
section.
Highway
101
noise
is
often
more
perceptible
in
Central
Brisbane
on
streets
at
higher
elevation,
and
may
ex-
perience
more
noise
from
pile-driving.
This
fact
should
be
stated.
Noise
estimates
cited
for
pile-driving
are
based
on
proximity
to
site.
Topography
does
not
appear
to
have
been
factored
into
these
calculations
and
must
be
consid-
ered.
On-site
Re-
1444
ceptors
ar.
2-3
.J-33
Miti-
Pile-driving
and
construction
activities
should
not
be
permitted
during
nighttime
hours
because
it
may
exceed
the
CNEL
and
sleep/habitability
of
residents
not
only
in
Brisbane
but
also
adjacent
communities.
The
construction
projected
to
last
for
many
years
could
have
serious
health
consequences
from
the
effects
of
noise/vibration
.
.
J-34,
Con-
"pile-driving
activities
would
result
in
a
significant
impact
"
clusion
Earlier,
pile-driving
is
said
to
not
be
significant
(p.
4.J-33;
see
above).
Is
the
pre-
vious
statement
incorrect?
"No
extreme
noise-generating
activities
would
be
allowed
on
weekends
and
holi-
days;"
at
is
meant
by
"extreme,"
and
should
we
expect
extreme
noise
to
be
generated
during
the
week
over
the
whole
long
Project
process?
The
list
of
equipment
causing
noise
omits
pile
driving,
and
should
be
included.
hie
4.J-8
.J-34
There
is
no
Mitigation
measure
"below,"
as
cited
in
paragraph.
5-248
Previous Next