2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
piles
versus
driven
piles),
alternative
foundation
types
for
the
new
construction
(e.g.,
spread
footings
versus
driven
piles),
alternative
compaction
methods,
and
physical
measures
(intervening
trench,
increased
distance).
Require
monitoring
to
be
conducted
at
the
building
during
construction.
This
monitoring
can
include
crack
gages
on
existing
cracks
and
vibration
amplitude
monitoring.
Establish
warning
and
stop
work
thresholds
for
monitoring.
Implement
visual
and
audible
signals
that
are
triggered
by
a
vibration
monitor
when
exceedances
of
warning
and
stop
work
thresholds
occur.
If
warning
thresholds
are
exceeded
routinely,
consider
alternative
construction
approaches.
If
the
stop
work
threshold
is
exceeded,
evaluate
the
condition
of
the
building
for
damage.
If
no
damage
is
indicated
consult
with
structural
engineer
and/or
architectural
historian
to
assess
whether
higher
thresholds
are
possible
and
adjust
as
appropriate.
If
damage
occurs
determine
if
any
other
construction
approaches
are
feasible
to
reduce
vibration.
If
none
is
available
examine
the
severity
of
the
damage
to
determine
if
damage
is
minor
and
repair
is
feasible.
If
repair
is
feasible
continue
with
construction,
but
monitor
vibration
and
damage
closely
to
ensure
that
damage
remains
repairable.
Consider
whether
a
lower
stop
work
threshold
is
feasible.
If
damage
approaches
becoming
unrepairable
and
vibration
levels
have
approached
or
exceeded
the
stop
work
threshold
repeatedly,
reconsider
construction
of
the
project.
Repair
any
damage
that
has
occurred.
The
purpose
of
monitoring
is
to
ensure
the
effectiveness
of
mitigation
measures.
The
measures
added
to
Mitigation
Measure
4.J-2b
in
Response
will
establish
both
warning
and
stop-work
thresholds.
The
warning
threshold
would
provide
a
direct
feedback
to
the
equipment
operators
when
vibration
limits
are
being
approached
and
allow
equipment
operators
to
adjust
their
activity
.
See
Noise
increases
presented
in
Draft
EIR
Table
4.J-4
are
based
on
a
comparison
of
roadway
traffic
volumes
with
and
without
development
of
the
Baylands
under
each
scenario.
For
Roadway
#3
(Old
County
Road),
average
daily
traffic
volumes
on
Old
County
Road
are
estimated
to
increase
from
6,045
under
existing
conditions
to
10,490
under
the
DSP-V
scenario
with
an
event.
This
increase
translates
to
an
increase
of
2.4
dBA,
which
would
be
a
less-than-significant
impact,
as
identified
in
the
Draft
EIR
(a
less
than
3
dBA
increase
in
an
area
where
existing
levels
are
less
than
65
dBA).
Noise
increases
presented
in
Table
4.J-4
of
the
Draft
EIR
are
based
on
a
comparison
of
roadway
traffic
Brisbane
Baylands
Final
EIR
2.9.2-122
May
2015