22
January
2014
To:
The
City
of
Brisbane
RE:
Draft
EIR
Brisbane
Bayrands
#2006022136
Honorable
Planning
Commissioners
and
City
Council
Members:
As
a
native
of
Brisbane
and
former
Planning
Commissioner
and
co-author
of
the
old,
but
still
legal
and[
effective,
current
voter
ratified
General
Plan
for
the
City
of
Brisbane,
I
urge
you
to
see
the
inherent
inconsistencies
and
lack
of
real
data
and
.
actual
mitigations
for
possible
potential
impacts
in
this
proposed
Environmental
Impact
Report
and
to
find
this
draft
E.l.R.
to
be
inadequate.
As
admitted
over
and
over
in
these
3,000
or
so
pages,
no
real
determination
can
be
made
at
this
time
as
to
any
environmental
impacts,
or
mitigations,
for
this
conceptual
proposal
because,
in
reality,
there
is
1
NO
SPECIFIC
PLAN
as
required
by
Brisbane's
General
Plan.
A
Project
E.l.R,
by
its
very
nature,
puts
t
he
cart
before
the
horse.
UPC
is
attempting
to
circumvent
CEQA
safeguards
for
our
community
and
the
State
of
Caiffornia,
in
asking
for
carte
blanche
approval
of
any
and
all
future
"development"
of
this
area
by
using
a
Project
E.l.R
to
approve
a
phantom
project,
yet-to-be-determined.
And
it
is
exactly
this
that
ou
r
current
General
Plan
specifically
and
deriberately
prevents
by
requiring
an
absolutely
Specific
Plan
for
the
entire
area.
Piecemeal
unspecified
mitigations
and
approvals
are
being
asked
for
unknown
building,
and
if
granted,
2
will
put
all
of
the
responsibilities
for
the
future
build-out
of
a
variety
of
such
projects,
in
a
hodge-podge,
patchwork,
inconsistent
pattern,
onto
the
City
of
Brisbane,
rather
than
on
the
shoulders
of
t
he
"developer,"
which
is
where
such
responsibilities
lie.
This
would
pave
the
way
for
UPC
to
sell
off
bits
and
pieces
of
the
project
and
their
responsibility
for
it,
here
and
there,
potentially
leaving
Brisbane
with
a
wrecked
environment,
unfinished
or
unoccupied
buildings,
disconnected
or
inadequate
infrastructure,
and
no
economic
or
other
benefits
over
time,
especially
given
the
fluctuating
nature
of
our
economy.
It
is
our
duty
to
make
sure
that
any
and
all
such
proposals
meet
all
CEQA
guidelines
(p.
7-2),
with
which,
despite
claims
to
the
contrary,
this
conceptual
proposal
has
serious
issues
regards
transportation;
water;
open
space
and
habitat;
economic
vitality
with
equity
and
ecology;
and
health,
safety
and
happiness.
To
give
an
idea
of
some
of
the
inherent
inconsistencies
in
trying
to
create
an
E.l.R
in
the
absence
of
a
specific
plan,
p.
3-38,
in
reference
to
one
of
the
people'
s
major
concerns,
the
biological
environment,
we
find
"Issuance
of
an
Incidental
Take
Permit
[for
the
killing
of
an
endangered
speciesJ1
if
necessary1
for
special
status
species
from
CDFW
will
require
completion
of
specific
engineering
designs
for
site-
specific
development
and
infra-structure
to
determine
whether
such
permits
would
1
in
fact,
be
required"
as
a
way
of
not
having
to
actually
address
this
issue
in
the
draft
E.
l.R.
because
there
is
no
specific
plan.
In
fact,
the
entire
issue
of
habitat
and
its
conservation
is
sidestepped
in
this
report,
on
p.
3
4.1-15,
in
claiming
the
'project
site'
is
not
subject
to
any
Habitat
Conservation
Plan,
except
for
lee
House
Hill,
t
hereby
obviating
any
responsibil
ity
for
their
erroneous
claims
that
there
are
no
species
to
protect,
e.g.
p.
4.C-64,
4.C-13,
etc.
5-613