Dettmer
DEIR
Traffic
and
Circulation
Comments
Citizen
Comments
Submitted
by
Linda
M.
Dettmer
Table
2-1
Note:
This
table
contains
SU
(Significant
Unavoidable)
situations
too
P.
2-67
numerous
to
count.
This
suggests
that
not
enough
mitigation
for
the
traffic
scenarios
represented
here
have
been
investigated.
Any
items
presented
as
SU
must
be
mitigated
for
safety
and
continued
ease
of
traffic
flow.
*see
end
of
comments
-
excerpts
from
DEIR
1
4.B-7
The
CARB
identified
DPM
as
a
toxic
Diesel
Particulate
Matter
DPM
air
contaminant
....
primarily
based
on
evidence
of
demonstrating
cancer
effects
in
humans.
(bold
added)
Exhaust
from
diesel
engines
includes
hundreds
of
different
gaseou
and
particulate
components
which
are
toxic.
Mobile
sources
such
as
trucks
and
buses
are
among
the
primary
sources
of
diesel
emissions,
and
concentrations
of
DPM
DPM
sources
are
higher
near
heavily
traveled
highways
...
The
estimated
cancer
risk
from
2
exposure
to
diesel
exhaust
is
much
higher
than
the
risk
associated
with
any
other
toxic
air
pollutant
routinely
measured
in
the
region.
(Excerpt
from
American
Cancer
Society,
2009)
The
number
of
routine
diesel
vehicle
trips
created
by
building
of
any
Project
will
be
a
significant
producer
of
DPM.
Also
future
increased
vehicular
traffic
by
buses,
cars,
trncks
etc.
will
add
to
the
DPM
in
our
air.
Mitigation
suggested
would
be
to
require
Developer
to
use
clean
air
vehicles
during
any
pe1mitted
build-out
or
other
mitigation
as
described
and
enforced
by
the
City
.
4.B-11
build-out.
Diminished
air
quality
is
a
major
factor
of
traffic
increase
due
to
Project
I
3
4.B-38
Mitigation
measures
and
enforcement
must
be
described.
4.N-12
Table
This
transpmtation
analysis
estin1ates
that
development
of
the
Project
Site
would
result
in
approximately
44,985
new
vehicle
trips
per
day
for
the
DPS
scenario
and
almost
twice
as
many
for
the
CPP
scenarios.
Such
levels
of
traffic
congestion
as
suggested
in
DEIR
are
unacceptable
to
health
and
safety
during
and
after
build-out.
Emergency
vehicles
in
paiticular
must
have
acceptable
access
to
all
areas
at
all
times,
before
during
and
after
Project
build-out.
As
well,
traffic
flow
must
remain
at
a
pace
where
gridlock
is
avoided.
(LOS
C)
Mitigation
needs
must
be
described
and
enforced.
5
5-539
Previous Next