SFB
Baykeeper
DEIR
Comments
January
24,
2014
a
manner
consistent
w
ith
the
San
Francisco
Regional
MS4
permit.
This
measure
also
states
finished
floor
levels
shall
'
provide
a
minimum
of
foot
of
freeboard
above
the
100-year
storm
event
w
ith
t
idal
flow
and
100
years
of
esti
mated
sea
level
rise'.
The
DEIR
makes
some
reference
to
estimated
flood
heights
in
the
DEIR
but
fails
to
pr
ovide
definit
ive
finished
floor
levels
or
other
design
heights
intended
to
minimize
flood
risk.
Surface
Water
Hydrology
and
Water
Quality
4.H-8
MM
4.H-8
This
measur
e
impermissibly
defer
s
the
preparation
and
approval
of
a
Sea
Level
Rise
Risk
Assessment
Report
to
the
Cit
y.
Given
the
proximity
of
the
site
to
San
Francisco
Bay
and
a
t
idal
lagoon,
this
plan
should
accompany
the
EIR
to
faci
litate
adequate
public
review
prior
to
review
by
the
Bay
Conservation
and
Development
Commission
(BCDC).
This
measur
e
impermissi
bly
defer
s
the
preparation
and
approval
of
a
'
detailed
vi
bration
design
study'.
Given
the
pr
oxi
mity
of
the
project
to
Ca
ltrain
and
Interstate
101
to
anticipated
sensitive
receptors
the
public
shou
ld
have
the
opportunity
to
review
such
a
study
and
i
nform
the
mitigation
measure
selection
process.
This
measur
e
calls
for
the
development
of
a
Transportation
Management
Plan
Traffic
and
Circulation
4.N-1
(TMP)
prior
to
issuance
of
the
building
occupancy
permit
for
an
arena
w
ithin
MM
4
.N-lf
the
Project
Site.
Given
the
likely
t
r
affic
impacts
resulting
from
the
project
alternative
including
an
entertainment
ar
ena,
plus
the
need
to
encourage
a
range
of
transit
options
for
the
project,
the
public
should
have
the
opportunit
y
to
review
this
TMP
prior
to
EIR
approval.
Noise
and
Vibration
4.J-
1
MM
4.J-2a
Thank
you
for
considering
Baykeeper's
comments.
We
hope
the
Applicant
takes
this
opportunity
to
re-
evaluate
the
range
of
impacts
and
seek
necessary
consultations
to
permit
adequate
public
review
of
this
project.
Sincerely,
Ian
Wren
Staff
Scientist
San
Francisco
Baykeeper
4