Page
4.C-5
SBMW
Comment:
At
least
one
wetlands
area
has
been
omitted
or
mischaracterized:
There
area
wetlands
near
the
former
railroad
yard.
Comment:
Native
plants
are
distributed
among
non-natives
on
a
lot
of
the
Baylands.
It
would
be
helpful
to
have
a
complete
vegetation
map
and
plant
list
so
that
a
strategic
plan
for
expanding
existing
native
plant
habitat
could
be
developed.
Page
4.C-9
"The
freshwater
emergent
wetlands
on
the
Project
Site
typically
lose
surface
water
or
completely
dry
up
during
the
summer
months
...
"
Comment:
During
normal
rainfall
years,
there
are
some
freshwater
wetlands
that
last
throughout
the
year.
These
should
be
distinguished
from
the
truly
seasonal
wetlands.
Both
are
valuable.
Page
4.C-14
Comment:
There
is
no
mention
of
Stickle
Back
Fish
--
these
were
seen
in
the
Baylands
within
the
last
6
years.
17
Page
4.C-19
Comment:
Four
disparate
days
is
not
enough
time
for
biologist
to
do
surveys
for
the
following
species
that
could
be
present:
Garter
Snake,
San
Francisco
Damsel
Fly,
Stickle
Back,
Mountain
Salt
Marsh
Mouse
and
the
California
Red-Legged
Frog.
I
19
Page
4.C-37
;
4.C-39
Mitigation
measure
4.C-lb
states:
"If
the
City
determines
that
disturbance
or
mortality
is
unavoidable,
special-status
plants
shall
be
restored
onsite
in
either
the
annual
grassland
o
r
coastal
scrub
habitat
located
on
lcehouse
Hill."
Comment:
Viola
pedunculata
has
not
been
cultivated
successfully
on
San
Bruno
Mountain.
It
will
not
work
to
mitigate
for
habitat
loss
by
planting
this
viola.
Therefore,
there
is
no
acceptable
mitigation
for
destroying
any
Callippe
silverspot
habitat.
Comment:
If
a
water
tank
is
required
for
this
project,
where
else
besides
lcehouse
Hill,
could
it
be
placed?
While
trails
may
be
found
that
avoid
Callippe
habitat,
this
would
not
be
the
case
for
a
water
tank?
Are
other
options
for
location,
for
example,
on
sensitive
habitat
elsewhere
on
San
Bruno
Mountain,
being
considered
and
if
so,
what
are
the
impacts
of
that?
Page
4.C-60
Comment:
If
habitat
is
removed
and
not
replaced,
the
result
will
NOT
be
less
than
significant.
Mitigation
measure
4.C-4g
should
include
replacement
of
habitat.
Comment:
There
are
a
number
of
significant
impacts
on
the
biological
resource
and
the
refore
there
are
a
number
of
mitigations
proposed
to
lessen
or
eliminate
the
impacts
--
I
counted
19.
The
impacts
and
mitigations
should
be
listed
in
a
table.
The
table
should
include
the
timeline
for
each
mitigation,
its
estimated
cost,
the
agency
responsible
for
overseeing
and
enforcing
each
mitigation,
and
the
consequences
if
the
mitigations
are
not
followed
through
on.
Money
should
be
placed
in
escrow
to
cover
all
these
costs
before
the
action
creating
the
impact
is
allowed.
20
I
21
23
5-502