CPA2
6
Conclusion
To
summarize,
the
DEIR
Analysis
incorrectly
conflates
the
quantities
of
wind
speed
and
turbulence
intensity
with
that
of
Sailable
Days.
It
measures
the
P
roject's
impact
on
wind
speed
and
turbulence
intensity
but
does
not
measure
t
he
impact
on
Sailable
Days
or
any
other
equivalently
instructive
quantity.
Assuming
that
the
wind
speed
and
turbulence
are
interchangeable
wit
h
or
necessarily
proportional
to
Sailable
Days
is
arbitrary,
lacks
any
foundation,
does
not
meet
the
standards
required
by
CEQA,
is
misleading,
and
is
certainly
not
good
and
faithful
professional
engineering.
T
he
Analysis
does
not
specify
a
threshold
for
significant
impact
in
terms
of
the
Resource
itself
yet
claims
that
there
is
no
significant
impact
on
the
Resource.
T
he
Analysis
conducted
makes
an
overwhelming
number
of
simplifying
assumptions
without
justification
or
detail
of
alternatives
or
the
consequence
of
these
assump-
tions
yet
it
reports
extremely
precise
results
with
absolute
confidence
(i.e.
no
contingency
for
error
in
t
he
assumptions
made).
50
At
the
very
start
of
the
Analysis,
the
impact
area
examined
does
not
match
t
he
area
in
which
actual
activity
is
predominantly
conducted
at
the
Resource
and
covers
an
arbitrary
portion
of
the
entire
CPSRA.
Further-
more,
even
within
the
possible
area
to
examine,
t
he
Analysis
only
reports
a
handful
of
new
potential
impact
measurement
points
that
does
not
include
areas
closest
to
the
P
roject
and
potentially
most
significantly
im-
pacted.
T
he
thoroughness
of
examining
the
potential
impact
area
does
not
match
with
levels
established
in
other
smaller
projects,
even
t
hough
this
P
roject
much
larger
scope
and
substantially
less
detail
and
certainty
than
those
other
projects.
T
hese
Comments
demonstrate
that
especially
within
the
Practical
Sailing
Area
of
critical
importance,
t
he
true
potential
impact
under
a
reasonable
measure
such
as
Sailable
Days
is
between
9%
and
44%
given
wind
speed
reductions
of
5%
to
10%
and
wind
turbulence
intensity
increases
of
5%
to
10%.
These
level
of
wind
speed
reductions
and
wind
turbulence
intensity
increases
are
found
within
a
substantial
portion
of
the
Prac-
tical
Sailing
Area
under
a
variety
of
wind
conditions
even
considering
that
the
Analysis
does
not
analyze
the
most
likely
substantially
impacted
portions
of
the
P
ractical
Sailing
Area
or
under
certain
wind
conditions.
Taken
individually
or
collectively,
the
risk
of
a
substantial
impact
to
the
Resource
is
demonstrably
great
and
substantially
more
significant
than
proposed
by
the
DE
IR
Analysis.
This
sailing
location
is
of
paramount
importance
as
it
is
one
of
t
he
most
consistent,
most
accessible,
and
highest
quality
of
all
of
the
San
Fra
ncisco
Bay
Area,
which
places
it
among
t
he
very
highest
in
the
entire
continental
United
States.
Careful
mitigations
should
be
included
to
ensure
that
potentially
grave
damage
to
this
Resource
is
avoided.
Multiple
mitigation
recommendations
are
proposed
in
these
Comments.
The
most
critical
is
to
establish
a
minimum
Waterfront
Preservation
District
within
the
Critical
Upwind
Section
between
the
Alemany
Gap
and
the
Practical
Sailing
Area
and
keep
it
as
free
from
development
and
other
interfering
activities
as
possible.
Other
considerations
such
as
architectural
streamlining,
orienting,
and
stepped
massing
are
also
essential
for
both
wind
flow
as
well
as
to
ensure
public
view
preservation
as
much
as
possible.
The
establishment
of
the
recommended
minimum
Waterfront
Preservation
District
will
be
the
key
to
ensur-
ing
that
all
residents,
visitors,
and
businesses
of
Brisbane
benefit
from
this
project
in
addition
to
increasing
values
for
private
project
sponsors
and
maintaining
recreational
opportunities
in
the
water
at
CPSRA.
Continued
reassessment
of
wind
and
sailability
impact
should
be
conducted
at
subsequent
stages
of
the
Project's
development
once
additional
detail
and
options
have
be
more
firmly
determined
or
stages
of
t
he
Project
developed.
Not
only
is
it
critical
to
test
what
could
actually
be
built,
but
it
is
critical
to
validate
that
some
of
the
many
assumptions
made
in
the
current
Analysis
prove
to
stand
up
to
time
and
more
thoughtful
analysis
methods.
Importantly,
monitoring,
testing,
and
enforcement
programs
with
penalties
should
be
established
and
funded-