OSEC
Open
Space
&
Ecology
CEQA
Comments
on
Brisbane
Baylands
Draft
EIR
-
2013
go
uncovered.
We
believe
that
there
is
another
section
where
residential
is
said
to
boarder
the
project?
This
would
be
contradictory.
Also
see
Figure
4.J-2
Page
4.J-7
The
"noise
monitoring
locations"
shown
in
Figure
4.J-l
should
also
include
locations
in
central
Brisbane
as
well
as
Northeast
Ridge,
since
most
of
the
current
community
resides
there.
Without
including
these
location
significant
Noise
and
Vibration
related
impacts
could
go
uncovered
and
residents
could
go
uninformed
of
the
potential
auditory
dangers.
Page
4.J-8
The
map
found
in
Figure
4.J-2
should
include
the
proposed
school
in
the
DSP
and
DSPV,
and
not
just
the
existing
schools.
If
this
data
is
omitted,
the
general
public
will
assume
that
the
proposed
school
is
not
a
sensitive
receptor
location,
and
potential
Noise
and
Vibration
impacts
will
be
overlooked.
Page
4.J-16
Under
the
"Substantial
Temporary
or
Periodic
Increases
in
Noise
Levels
in
the
Vicinity
of
the
Project
Site
above
Levels
Existing
without
Project
Site
Development"
section
pile-driving
is
not
mentioned.
The
estimated
time
it
would
take
to
pile-drive
for
each
building
should
be
included
so
that
the
general
public
has
an
idea
of
the
potential
harm
the
noise
could
cause.
Significant
Noise
and
Vibration
related
impacts
should
not
go
uncovered.
Page4.J-l7
Amplification
of
sound
in
the
Baylands
would
change
after
completion
of
construction.
Amplification
of
sounds
resonating
from
the
buildings
should
be
studied
and
addressed
in
this
chapter
in
order
to
cover
all
potential
Noise
and
Vibration
impacts.
Page
4.J-24
lst
paragraph
states,
"
....
closest
existing
offsite
sensitive
use
would
be
over
l
,000'
north
..
.
"
Specify
what
the
closest
offsite
sensitive
use
is.
Page
4.J-25
Mitigation
measures
as
described
place
the
burden
on
the
citizens
and
the
city.
A
much
more
effective
mitigation
strategy
would
be
to
install
"listening"
stations
that
monitor
&
record
noise
events.
Page
4.J-31
The
preceding
page
indicates
that
two
wind
turbines
near
each
other
can
combine
to
create
a
thumping.
Therefore
the
mitigation
measures
should
include
a
minimum
distance
between
wind
turbines.
Page
4.J-32
The
data
found
in
Table
4.J-7
is
from
1971
,
making
it
out
of
date,
which
could
alter
the
method
used
for
measuring
the
impact.
Please
provide
an
updated
source
of
data
so
that
no
impacts
are
overlooked.
Page
4.J-32
The
study
assumes
that
there
would
be
no
impact
on
central
Brisbane
due
to
the
distance.
From
previous
experiences
with
the
Cal
train
improvements,
located
within
the
heart
of
the
Bay
lands
we
know
from
personal
experience
that
this
is
not
the
case
thus
either
the
standards
or
data
are
in
error.
For
supporting
data
see
4.J-32
last
paragraph.
Pile
driving
data
from
Sierra
Point.
9ldbA
@
200'.
An
additional
mitigation
measure
should
be
added
to
Impact
4.J-4,
which
would
limit
pile-driving
activities
to
4
out
~~
of
every
5
days.
This
mitigation
measure
would
help
to
reduce
the
impacts
of
ambient
noise
levels
that
would
reach
Brisbane
residents.
General
comments
on
section
4.J:
l.
This
chapter
states
that
Brisbane
is
located
outside
of
the
fly-zone,
but
this
is
not
the
case.
After
speaking
with
TRACON,
FAA
out
of
Washington,
State
Senator
Yee'
s
office,
and
the
State
of
California
PUC
Aviation
1
299
cont.
I
I
I
I
I
I
I
300
301
I
302
303
304
305
306
307
I
I
J
308
309
310
45