OSEC
Open
Space
&
Ecology
CEQA
Comments
on
Brisbane
Baylands
Draft
EIR
-
2013
Chapter
4.D:
Cultural
Resources
Page
4.D-16
The
bone
storage
house
should
be
included
in
the
chart
even
if
not
it
is
historically
significant
to
show
that
the
matter
has
been
considered.
Page
4.D-25
State
the
firm
which
did
this
survey
to
ensure
a
more
complete
document.
Page
4.D-25
Last
bullet.
Maps
of
Brisbane
from
1946-2005.
Why
was
this
time
frame
chosen?
Alternatively
we
suggest
having
as
much
historical
reference
as
possible,
so
we
recommend
to
date
back
further.
Page
4.D-31
Seismic
testing
of
7
Mile
House
should
be
conducted
to
ensure
that
pile
driving
will
not
affect
the
building.
I
I
I
126
121
I
I
128
I
129
What
method
will
be
used
to
get
core
samples?
How
might
archeological
artifacts
be
preserved
that
are
found
in
the
core
samples?
~~
130
Chapter
4.E:
Geology,
Soils
and
Seismicity
(Comments
that
are
from
different
sections
in
the
document
are
relevant
to
section
4E)
Page
3-15
Figures
3-4
and
3-6
seem
inconsistent
since
the
landfill
in
the
railyard
shown
in
Figure
3-4
is
not
shown
in
Figure
3-
6.
The
presence
of
the
non-engineered
fill
in
the
former
rail
yard
is
important
due
to
the
potential
for
liquefaction
on
the
Project
Site.
Please
address
this
issue
and
its
inconsistencies,
since
the
potential
for
an
impact
relating
to
liquefaction
exists
on
site.
What
is
the
difference
between
liquefaction
and
subsidence
with
different
types
of
fill?
Page
4.E-1
Sunset
Scavenger
waste
records
should
be
investigated
to
understand
landfill
contents.
Page
4.E-1
Is
the
Regional
Water
Board
the
sole
agency
that
documents
the
landfill
contents?
Page
4E-l
In
the
last
paragraph
it
states,
"At
the
time
of
closure
of
the
landfill
in
1967,
a
soil
cap
was
placed
over
the
landfill
and
additional
clean
soil
has
also
been
placed
over
much
of
the
site
(BKF,
2011)."
Has
the
soil
been
checked
to
ensure
that
it
is
clean
prior
to
using
this
dirt
onsite?
The
mitigation
for
this
should
include
testing
for
other
hazardous
materials
it
may
contain.
Page
4.E-
1
The
document
states
that
"primarily"
non-hazardous
wastes
were
disposed
of
in
the
landfill.
Were
there
also
hazardous
wastes?
What
are
the
hazardous
materials
referred
to
on
page
4.E-1?
Define
what
is
meant
by
"typically"
in
this
case.
Define
what
those
hazardous
materials
are,
and
how
they
will
be
mitigated.
There
should
also
be
testing
for
radioactivity
and
all
hazardous
wastes.
Page
4.E-1
The
DEIR
should
include
information
from
Dr.
Lee's
report
dated
November
2010,
"Report
on
the
Adequacy
of
the
Investigation/
Remediation
of
the
Brisbane
Baylands
UPC
Property
Contamination
Relative
to
Development
of
this
Property'',
which
is
relevant
to
the
topic
of
waste
and
chemicals
in
the
landfill.
131
J
132
I
133
I
134
The
statement
that
"
...
the
majority
of
the
site
being
flat
or
gently
sloping
toward
the
Bay."
This
statement
while
unclear
give
the
impression
that
the
land
slopes
down
towards
the
bay.
The
topographical
map
on
page
4.E-5
which
~re~~
l
138
19
5-324
Previous Next