OSEC
Open
Space
&
Ecology
CEQA
Comments
on
Brisbane
Baylands
Draft
EIR
-
2013
Page4.B-17
Footnote
9
the
BAAQMD
guidance
stipulates
inclusion
of
PM
2.5
exhaust
emissions
only
in
this
analysis.
Why
are
PM
10
emissions
not
addressed?
Page
4.B-18
Paragraph
2
"Table
1"
should
presumably
read
''Table
4.B-
1."
Page
4.B-21
Mitigation
measure
4.B-1
should
take
rain
events
and
afternoon
winds
into
consideration
when
determining
a
watering
schedule
to
mitigate
dusts.
There
should
be
a
goal
of
zero
fugitive
dust
produced
from
site
construction
activity.
Page4.B-23
Paragraph
3:
emissions
must
also
be
considered
for
the
remediation
phase.
Page
4.B-23
Paragraph
3
gives
a
history
of
the
revisions
for
air
quality
standards.
Given
this
clear
illustration
of
how
standards
are
evolving,
the
Baylands
project
should
be
designed
with
this
in
mind
so
that
it
does
not
immediately
fall
into
non-
compliance
when
standards
are
next
revised.
Page4.B-30
Table
4.B-8
through
4.B-12:
None
of
the
tables
take
into
account
background
pollution
as
a
result
of
the
landfill.
where
are
the
cumulative
effects
of
pollution
considered?
Page4.B-34
This
section
appears
to
be
talking
about
construction
related
cancer
risks;
however,
it
seems
unlikely
that
the
workforce
would
be
in
residence
during
the
construction
phase
so
the
relative
vehicle
trips
per
day
should
not
be
reduced
due
to
the
housing
credit.
44,985
trips
for
the
DSP
and
82,176
trips
for
the
CPP
seems
an
impossible
ratio.
Please
clarify.
Page4.B-37
Use
of
electric
[or
manual]
landscape
equipment
should
be
considered.
Page4.B-39
Cancer
risk
assessments
for
school
children
are
calculated
on
9-year
exposure
duration.
Please
explain
or
recalculate
for
12-year
exposure
duration
since
children
usually
go
to
school
for
12
years
or
more.
Page4.B-43
Health
impacts
for
Caltrain
are
based
on
existing
96
trips
per
day.
What
will
the
health
impacts
be
for
the
additional
trips
to
accommodate
the
service
population
as
described
elsewhere
in
the
EIR?
Page4.B-48
Project
site
development
would
not
support
the
primary
goals
of
the
(BAAQMD)
clean
air
plan.
Would
the
Alternative
Energy
Generation
support
these
goals?
This
should
be
stipulated.
Page
4.B-5
1
Table
4.B-21
,
ECM
4.
Shade
tree
planting:
it
was
our
understanding
that
trees
were
not
going
to
be
used
in
order
to
prevent
their
roots
from
disturbing
the
landfill
cap.
How
can
we
have
substantial
tree
planting
and
still
preserve
the
cap?
General
comments
on
section
4.B:
1.
Pollution
from
the
Bay
Area
travels
to
the
Central
Valley
from
operations
and
construction.
Winds
will
blow
pollution
east
of
the
project
site.
What
methodology
may
be
used
to
assess
the
damage
from
the
Baylands
development?
Regionally
where
will
it
travel
and
what
will
be
the
impact?
I
9
5-314