BCC
Chapter
6:
Cumulative
Impacts
DEIR
section
page
No.
6-1
Table
6-1
Comments
This
table
should
be
updated
based
on
all
the
comments
submitted
regarding
the
various
impact
categories.
Grave
doubts
have
been
expressed
about
the
judgment
used
in
determining
which
impacts
are
mitigable
and
which
are
not.
"by
improving
access
to
US
Highway
101,
...
would
remove
a
major
obstacle
to
development"
The
DEIR
addresses
access
to
Highway
101,
but
does
not
discuss
the
potential
benefit
of
widening
the
Highway.
With
this
roadway
already
at
capacity
at
peak
traffic
hours,
improving
access
from
all
of
the
developments
in
the
PDA
would
still
severely
impact
local
area
roads.
Any
information
on
plans
for
the
potential
mitigation
achievable
through
widening
101
should
be
included
--
or
the
absence
of
such
potential
analyzed.
6-4
785
6-6
References
to
ABAG
2009
projections
here,
and
elsewhere
in
the
DEIR,
are
out-of-date.
2013
projections
have
been
available
since
July
2013,
and
should
be
used
throughout
the
EIR.
"Pursuant
to
CEQA
Guidelines
Section
15130(a)(1),
an
EIR
should
not
discuss
impacts
which
do
not
result
at
least
in
part
from
the
project
being
evaluated
in
the
EIR."
1
7
86
787
6-7
6.3.1
Approach
to
Cumulative
Impact
Analysis
It
should
be
made
clear
how
this
CEQA
restriction
is
applied
in
this
DEIR.
The
cumulative
impacts
on
Brisbane
by
the
approved
developments
already
under
way
in
the
adjacent
areas
of
San
Francisco
and
Daly
City,
as
listed
in
Table
6-2
(p.
6-9
thru
6-11),
must
be
taken
into
consideration.
6-8
SF-CHAMP
model
travel
demand
estimates
are
based
on
increased
sensitivity
to
San
Francisco
conditions.
The
conditions
in
and
around
Brisbane
are
drastically
different
from
San
Francisco.
What
are
the
assumptions
made
in
this
model,
and
how
do
they
apply
to
Brisbane?
The
Northeast
Ridge
development
project
has
been
completed.
Thus,
the
table
should
be
updated
to
reflect
this.
As
previously
mentioned,
a
Highway
101
widening
project
should
be
included
as
an
necessary
mitigation
in
this
table.
1788
1789
6-9
Table
6-2,
Project
3
6-9
Table
6-2
1
790
5-300
Previous Next