4.N-150
Result
in
Inadequate
Emergency
Access
Limited
number
of
entry/egress
points
must
have
further
study
and
possible
redesign.
A
major
emergency
or
disaster
at
the
Kinder
Morgan
site
has
not
been
addressed
and
must
be
studied
as
this
poses
a
significant
hazard
to
health
and
safety
of
everyone
on
site.
Need
to
study
impact
of
increased
traffic
from
site
flowing
onto
Lagoon
Wc>.y
c>.nrl
crPc>.ting
potPntic>.
l
mngPstion,
thPrPhy
limiting
PmPrgPncy
c>.ccPss
to
Sierra
Point.
1
4.N-150
Loading
Mitigation
Measure
4.N-17
The
DEIR
needs
to
specify
the
range
of
vehicles/tmcks
that
would
be
at
site
depending
on
the
types
of
businesses
occupying
the
various
scenario
buildouts.
Depending
on
the
total
volume
of
such
traffic,
there
could
be
public
safety
issues
to
bicyclists
and
pedestrians.
Mitigation
4.N-17
inadequately
addresses
traffic.
It
overlooks
the
sheer
number
of
trucks
anticipated.
Development
plans
unclear
about
number
and
location
of
on-street
parking
spaces
and
parking
structures
and
needs
to
address
trucks/delivery
vehicles
as
well
as
cars.
1740
5-288