BCC
several
development
proposals
recently
receiving
approval.
1585
4.N-52
"the
only
substantive
difference
in
the
roadway
improvements
between
DSP/DSP-Vand
CPPICPP-V
scenarios
is
that
the
frontage
road
would
not
continue
to
provide
access
to
Geneva
Avenue
under
the
CPPICPP-V
scenarios"
586
The
Geneva
Avenue/Harney
Way
US
101
onramp
improvement
(p.
4.N-44)
and
the
commercial
developments
in
the
CPP
can
be
expected
to
also
pull
traffic
through
this
area;
therefore,
the
frontage
road
should
not
be
removed
from
the
CPP/CPP-V
study.
4.N-53
Roadway
Improvements
Figure
4.N-13
4.N-53
Bullet
Pt.
3
According
to
bullet
point
2:
"Beatty
Road
access
would
be
maintained
and
would
provide
a
linkage
to
Tunnel
Avenue
(DSP,
DSP-V,
and
CPP
scenarios
only)"
Figure
4.N-13,
CPP
Conceptual
Road
Network
Improvements
map
does
not
show
Beatty
Road
and
should
be
corrected.
The
proposal
to
terminate
Tunnel
Avenue
to
a
"T"
intersection
with
Lagoon
Way
would
result
in
site
traffic
using
Old
County/Bayshore
intersection
as
a
primary
access
point
to
and
egress
from
the
Site.
Since
this
intersection
is
a
primary
entry
point
to
central
Brisbane,
increased
traffic/congestion
will
result
in
backups
on
the
bridge
during
peak
hours
and
residents
of
central
Brisbane
will
not
be
able
to
get
home
in
a
reasonable
amount
of
time.
Study/investigation
of
another
termination
for
Tunnel
Avenue
with
egress
north
of
Icehouse
Hill
is
recommended.
This
may
be
a
significant
impact
and
mitigation
of
this
problem
is
necessary
to
site
development
under
all
development
proposals.
588
1589
l590
4.N-54
Fig.
4.N-12
and4.N-57
Fig.
4.N-15
Caltrain
station
shown
north
of
Beatty
on
4.N-12
and
South
of
Beatty
on
4.N-15.
Maps
need
to
have
uniformity.
4.N-55
"Tunnel
Road"
should
read
"Tunnel
Avenue."
Figures
4.N-13
and
4.N-14
4.N-57
Fig/
4.N-15
DSP/DSP-V
and4.N-58
Fig.
4.N-16
CPP/CPP-V
Proposed
Transit
Public
transportation
service
to
southern
portion
of
site
is
conspicuously
absent
and
must
be
incorporated
into
transit
plans
or
commuting
by
automobile
will
be
necessary.
Lack
of
a
comprehensive
plan
for
the
southern
portion
of
site
creates
a
significant
but
mitigable
impact
and
must
be
addressed
in
all
site
plans.
l591
592
5-271