BCC
4.K:
Population
and
Housing
DEIR
(Section;
page
#)
Comments
4.K-1
Introduction
2nd
par.
The
DEIR
contradicts
itself
in
these
paragraphs:.
"Population
and
housing
..
..
under
CEQA
are
not
considered
to
be
significant
effects
on
the
environment".
"In
fact
all
of
the
impact.
..
in
EIR
would
result
from
the
construction
of
buildings
and
uses
associated
with
planned
increases
in
population
and
employment.
..
"
Housing
is
not
in
the
General
Plan
for
Brisbane
for
this
area.
Without
significant
remediation
of
the
landfill,
this
can
not
be
allowed
to
happen.
4.K-1
Introduction
2
nd
par.
No
mention
of
habitability
or
appropriateness
is
made
in
this
section.
Whether
the
site
can
be
successfully
remediated
is
questionable.
The
report
by
Dr.
Fred
Lee,
in
November
2010,
for
BBCAG,
states
there
are
extreme
amounts
of
landfill
and
contamination
that
require
remediation.
Also,
"Those
areas
and
chemicals
will
need
to
receive
proper
containment/treatment/removal
and
proper
monitoring
in
surface
waters,
ground
waters,
ambient
air,
and
air
within
structures
for
as
long
as
the
chemicals
remain
on
site
for
the
protection
of
public
health
and
environmental
quality."
One
must
conclude
from
this
that
the
only
safe
way
to
remediate
is
to
remove
the
contamination
and
replace
with
clean
fill.
Dr.
Lee
states
further,
any
"development
in
this
area
should
be
done
cautiously".
[bold
added]
Taken
into
account
also
are
VOCs
inside
and
out
of
the
buildings
and
the
heavy
metal
concentrations
in
the
Schlage
Lock
and
SP
rail
yard
areas
combined
with
surface
water
collection
particularly
near
the
railyard.
Dr.
Lee's
report
should
be
referred
to
and
included
as
an
Appendix
in
the
Final
EIR.
4.K-1-
Introduction
3rd
par
Assertion
is
made
that
GHG
will
be
decreased
by
improving
the
proximity
between
jobs
and
housing
on
the
site.
This
assumes
that
employees
of
businesses
will
be
able
to
afford
housing
there.
It
also
1463
5-251