BCC
studies
have
demonstrated
that
overall
most
of
the
GHG
emissions
are
produced
by
buildings
and
activities
associated
with
them,
not
cars
and
trncks.
This
fact
should
be
acknowledged
and
explicated
with
reference
to
the
Project
Site
scenarios
and
alternatives.
The
Regional
Housing
Need
Allocation
does
not
address
the
fact
that
ca.
40%
of
total
current
housing
in
Brisbane
has
been
recently
constructed
(in
the
Northeast
Ridge)
and
represents
proportionally
major
housing
growth
compared
to
other
Bay
Area:
cities.
This
responsible
land
use
should
be
cited.
Par.
3
1
"the
goals
of
SB
375,
Plan
Bay
Area
calls
for
future
development
to
be
walkable
and
bikeable
and
in
close
proximity
to
public
transit,
jobs,
schools,
shopping,
parks,
recreation
and
other
amenities."
The
CalTrain
station
in
Brisbane
could
promote
this
goal.
However,
it
is
highly
questionable
to
assume
that
enough
people
for
adequate
mitigation
could
walk
to
work
or
that
transit
would
be
accessible
both
from
where
they
live
and
where
they
work.
4.1-7
Figure
4.1-2
The
BCDC
map
is
inadequate
in
view
of
the
planned
Visitation
Creek
Park
West
(wetlands
park)
that
will
maintain
watershed
connectivity
to
the
bay,
thus
expanding
BCDC's
jurisdiction
and
ability
to
plan
for
climate
change
impacts.
Are
the
Plan
Bay
Area
projections
consistent
with
the
Brisbane's
General
Plan?
The
zoning
map
referred
to
in
this
section
is
out
of
date,
inconsistent
with
the
1994
General
Plan,
and
incorrect.
The
correct
present
zoning
of
the
entire
Baylands
is
PD,
Planned
Development.
The
descriptions
should
be
revised
to
be
consistent
with
the
General
Plan
PD
zoning.
The
same
corrections
should
be
made
in
Chapter
3,
Project
Description,
Fig.
on
page
and
related
text.
Removal
of
Policy
330.1
from
the
General
Plan
for
inconsistency
with
the
DSP
and
DSP
scenarios
would
require
a
vote
of
the
Brisbane
constituency,
and
should
be
so
stated.
Figure
XH
from
General
Plan
on
Baylands
should
be
overlaid
with
the
Project
map
to
compare
flood
areas
to
the
proposed
plan
scenarios.
Historical
marshlands
in
this
site
should
be
restored
and
this
mitigation
included.
Whatever
the
outcome
of
the
EIR
and
subsequent
studies
they
must
comply
with
General
Plan
policies
172
and
173,
as
follows:.
I
4.1-8
4.1-10
Zoning
Ordinance
4.1-10
4.1-10
Policy
172:
Establish
that
it
is
of
the
highest
priority
that
contaminated
5-242