BCC
Flooding
Due
to
Levee
or
Dam
Failure
water
surface
elevation
reaches
12.52
feet,
which
is
approximately
1.48
feet
below
the
surrounding
lowest
proposed
pad
elevation."
Thus,
if
the
"berm
were
to
fail
during
a
100-year
storm
event,
flows
would
flood
Bayshore
Boulevard
and
surrounding
areas
that
are
below
12.52
feet
but
would
not
inundate
proposed
structures
which
would
have
finished
floor
elevations
of
at
least
14
feet."
Concludes
that
"impact
due
to
failure
of
a
levee
or
dam
would
be
less
than
significant
for
Project
Site
development."
371
The
DEIR
concludes
there
will
be
"less
than
significant
impact"
from
potential
flooding
because,
under
existing
conditions,
any
berm
failure
would
flood
only
structures
below
12.52
feet,
and
that
Project
structures
would
be
"at
least
14
feet."
A
margin
of
error
of
1.48
feet
is
grossly
inadequate,
and
does
not
take
into
consideration
future
changes
to
the
climate,
extreme
weather,
and
other
impacts
due
to
climate
change.
Any
variety
of
scenarios
could
easily
cause
flooding
at
above
14
feet.
The
City
Council
should
consider
requiring
structures
to
be
built
higher
than
14
feet
to
ensure
safety
to
property
and
the
public.
(See
National
Geographic,
Aug.
2013,
re
sea
level
rise
above
3
feet;
Golden
Gate
Barage:
httg
://www.xconomy.com/national/2013/08/30/sea-level-rise-time-for-a-ba
rrage-of-new-ideas.)
Additionally,
all
throughout
the
DEIR,
there
are
repeated
conclusions
that
impacts
would
be
"less
than
significant."
But
what
does
this
mean?
Less
than
significant
in
terms
of
what
-
the
environment,
public
safety.
financial
impact?
Also,
what
is
considered
less
than
significant
-
an
impact
of
less
than
5%,
or
much
more
than
that?
cont.
372
"Appendix
G
of
the
CEQA
Guidelines
indicates
that
a
project
would
have
a
significant
effect
on
the
environment
if
it
were
to
...
[7th
and
8th
bullets]
Place
housing
within
a
100-year
flood
hazard
area
as
mapped
in
a
federal
Flood
Hazard
Boundary
or
Flood
Insurance
Rate
Map
or
other
flood
hazard
delineation
map;
Place
within
a
100-year
flood
hazard
area
structures
which
would
impede
or
redirect
flood
flows;"
Also:
4.
H-18,
19
4.
H.4
Impacts
and
Mitigation
Measures
Significant
Criteria
4.H-6
To
reinforce
the
previous
point,
mitigation
measures
do
not
adequately
address
the
"significant
hazards"
described.
373
The
source
ESA,
2012
and
FEMA,
1983
is
out
of
date;
also
BCDC
is
not
t374
5-237