BCC
inadequate.
Reference:
Report
on
the
Adequacy
of
the
Investigation!
Remediation
of
the
Brisbane
Bay
lands
UPC
Property
Contamination
Relative
to
Development
of
this
Property,
Dr.
G.F.
Lee
Dr.
Lee
questions
the
validity
of
the
Geosyntec
report
(p.
23,
par.
6)
that
no
data
was
shared
in
a
previous
report,
as
noted
by
Geosyntec
in
2006,
and
that
some
of
their
assessments
were
incomplete.
Dr.
Lee
asserts:
"A
single
measurement
of
this
type
is
not
necessarily
adequate
to
conclude
that
there
will
not
be,
at
other
times,
release
of
landfill
gas
or,
for
that
matter,
other
volatile
organics,
from
the
landfill
that
would
pose
a
threat
to
humans
and
wildlife.
Near-surface
landfill
gas
monitoring
needs
to
be
done
over
several
seasons
to
properly
measure
the
release
of
landfill
gas."
Reliable
and
up-to-date
information
needs
to
be
provided.
4.G-7
Detection
Monitoring
Program
Investigation
1987
4.G-4
thru
-30
A
report
by
Dr.
Fred
Lee
discusses
Landfill
Failure
Issues
in
contaminated
sediment.
Reference:
http://www.gfredlee.com/plandfil2.html#failure
1
215
cont.
216
The
DEIR
does
not
demonstrate
a
clear
and
robust
analysis
of:
history,
monitoring,
analysis
and
characterization
of
contaminants,
risk
analysis.
The
information
is
inconsistent,
and
the
authors
do
not
provide
a
transparent
analysis
of
evidence.
The
DEIR
must
demonstrate
a
comprehensive
assessment
with
clear
sitemaps,
systematic
descriptions
of
contaminants,
mitigation
goals,
and
remediation.
Need
more
specificity
about
the
testing
and
characterization
of
PCB
contamination
in
the
site.
It
was
a
common
practice
to
use
PCB-concentrated
coatings
for
railroad
ties
during
the
era
of
active
use
for
OU-1
and
OU-2.
The
DEIR
does
describe
sporadic
assessment
of
SVOC's
and
little
mention
is
made
of
PCB
contamination.
The
DEIR
fails
to
adequately
discuss
the
presence
or
effects
of
PCB
contamination
and
why
they
have
not
been
found
as
a
contaminant
on
the
site.
Also,
the
satellite-confirmed
(Appendix
H,
Photographs)
presence
of
a
large
tire
dump
in
the
landfill,
as
well
as
the
residue
from
a
long-lasting
fire
at
the
site,
must
be
fully
analyzed
and
proper
mitigation
described.
218
219
I
220
4.G-9
Air
Quality
"The
analytical
results
indicated
that
air
contaminants
apparently
were
not
emitted
from
the
landfill
into
the
ambient
atmosphere
at
levels
that
would
be
J,
221
5-207
Previous Next