BCC
Criterion-
Seismic
Groundshaking,
description
is
needed,
such
as
typical
thickness
and/or
reference
where
to
find
additional
information
in
the
report.
There
should
be
a
reference
to
the
visual
impact
of
grade
elevation
gain
in
other
impacted
sections,
i.e.
Visual
Impact.
Note:
p.
4.E-45
references
placement
of
up
to
26'
of
engineered
fill
at
railyard.
Significant
Criterion
-
Seismic
ground
shaking
For
all
UPC
scenarios
analyzed,
the
risk
is
called
"significant
but
mitigable"
for
a
"major
earthquake
(Richter
scale
6.
7
or
higher)"
through
use
of
a
"geotechnical
engineering
methods
...
in
accordance
with
California
Building
Code
requirements."
Results
of
studies
on
the
effectiveness
of
current
California
Building
Codes
in
high
magnitude
earthquakes
should
be
referred
to.
Soil
subsidence
mitigation
such
as
dynamic
compaction
and
soil
surcharging
will
compact
the
soils,
but
such
mitigation
will
not
protect
against
the
potential
for
future
soil
subsidence
and
loss
of
load-bearing
capacities
due
to
decomposition
of
organic
materials
in
the
soil.
Potential
impacts
of
this
decomposition
and
any
suggested
mitigations
should
be
specified.
1
4.E-37
4.E-45
Post
Construction
Development
4.E-45
Building
foundation
design
and
flexible
utilities
connections
will
help
to
Post-Constructio
mitigate
damage
to
structures,
but
does
not
address
long-
term
differential
n
Development
settling
at
site
hardscapes
(concrete
sidewalks
and
road
asphalt).
The
potential
long-term
impacts
and
mitigations
required
to
avoid
future
dips
in
roads
or
safety
during
emergencies,
offset
sidewalk
cracks,
and
misaligned
intersections
of
hardscapes
to
buildings
(i.e.
entry
walkways
and
wheelchair
ramps)
should
be
included.
4.E-45
Deep
dynamic
compaction
is
mentioned
and
described
very
briefly.
Additional
description
of
this
process
and/or
references
where
to
find
additional
info
in
the
report
should
be
included.
What
are
the
potentials
for
the
deep
ground
vibrations
to
create
other
unforeseen
damages
to
nearby
structures?
What
related
issues/problems
have
other
similarly
designed
intensive
developments
on
refuse-infilled
bay
shallows
encountered
and
mitigated
over
their
long
term
existence?
What
commensurate
mitigations
could
be
included
in
this
DEIR?
The
Kinder-Morgan
fuel
depot
and
associated
underground
pipelines
represent
a
potential
hazard
during
a
major
earthquake.
The
Project
area
surrounds
the
property
and
a
major
access/egress
road
borders
the
facility.
The
location
of
all
the
pipelines
serving
the
tank
farm
should
be
shown
on
appropriate
maps.
Plans
to
monitor
and
mitigate
the
potential
major
hazards
inherent
in
these
facilities
must
be
included
in
the
final
EIR.
General
Comment
General
question: